My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:00:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Pagel of 4 <br /> Mike Infurna [EH] <br /> From: Mike Infuma [EH] <br /> Sent: Wednesday, July 07, 2010 8:47 AM <br /> To: 'Gaarder, Jeff <br /> Subject: RE: Cordes Ranch, Tracy BILLING <br /> Attachments: MW field install form Scanned_.pdf <br /> Jeff, <br /> thanks. <br /> In the BEST case scenario, I usually witness the grout procedures for the FIRST shallow well <br /> installation. If I like what I see, I may be able to 'waive' additional shallow well grouts for this <br /> phase. (unless there is some problem) <br /> As for the deep wells, my August schedule has not been determined yet so it is likely I can be <br /> there for these. I will be onsite for the FIRST deep well grout. If I like what I see for these, it is <br /> possible that the deep well grouts may proceed without my inspection also. (assuming no <br /> problems and the following "update calls" go as planned. <br /> Update calls: <br /> at the very least, on days I am NOT there, a status update is to be phoned into my office at the <br /> end of EACH day advising me of the procedures/completions/well construction <br /> specifications that occurred that day and the plans for the next day. A phone voice mail is <br /> acceptable for these updates. <br /> I will need to know many things about each well. An example of a typical phone update is to <br /> include at least the following: <br /> - MWxx completed to (total depth drilled and bottom of casing) <br /> -length and size of screened interval (5' of .020, etc) <br /> -size and amount of filter material (#3 LoneStar, 400 pounds, etc) <br /> -top of filter material 'bgs <br /> -top of bentonite seal 'bgs <br /> -type/size and amount of bentonite used (i.e: 1/4" pellets, medium chips, 2 bags at 50 lbs <br /> each, etc) <br /> -grout mix and installation method (i.e: 1 bag 94 lbs portland Type IIN per 7 gallons, <br /> recirculated with grout pump, hydraulic twirl in 55 galloon barrel, etc. hand mix with a shovel <br /> is unacceptable, installation method, as in tremie pumped in, poured (not more than 30'), <br /> amount used in gallons and #of bags per mix). <br /> -casing material, size ( 2" PVC, Stainless Steel, Schedule 40 or 80 or 480, etc) <br /> -surface finish. i.e. stove pipe set (type, size, #feet below & above ground), bollards used? <br /> type, size, depth of install, and number OR traffic box. <br /> PDF attached is a field work sheet the EHD uses to record well construction methods and <br /> materials/specifications. I will be looking to complete this form from the information I receive in <br /> the DAILY update calls. <br /> If I do not receive a phone call on days I allow your team to grout w/o my inspection, typically 1 <br /> 7/7/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.