Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including, but not limited to,permitting, <br /> access agreements,and notification to required contacts(e.g.site managers, inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the begityting of <br /> each work day. Safe Performance Self Assessment(SPSA)procedures must be used throughout the project. Weather conditions(heat,cold, rain, lightning)must also 6e considered. <br /> 0 Joh Steps Personal Protective EquipmentZ Potential Hazard s <br /> Critical Actions <br /> lifling techniques. <br /> General <br /> •Keep SPSA card on you at all times. Use it frequently. What can happen? What is the worst thing that can hap Pen? Plan or it and caLry outZqurplan. <br /> Typical work Steel toed and shank shoes,hard hat,safety Weather related incidents: <br /> glasses with side shields,hearing protection, automobile accidents,slips and Check weather reports daily.Project visits will not be performed during <br /> reflective safety vest,leather gloves for the falls. inclement weather. Sampling may be performed during light rain mist. Wear <br /> non-chemical aspects of work. raincoats. <br /> If you suspect that equipment is •Drive at speed limit or less as needed to keep safe distance from vehicle in front, <br /> contaminated,wear chemical resistant gloves avoid short stops. <br /> during decontamination of equipment. <br /> No eating,drinking,or <br /> smoking on-site. <br /> No contact lenses on-site. <br /> No facial hair that would <br /> interfere with res ' r fit. <br /> A safety meeting will be <br /> held each day,even if there •Topics will always include the work scheduled for the day and restatement of <br /> is only one person working the hazards and means to avoid them. Other topics may include sampling in <br /> on the project on any given general and advances in technology and how it may be applied to the project. <br /> day. Use Attachment 7 for logging the topics discussed. <br /> SECOR International Incorporated 20 Generic HASP <br />