Laserfiche WebLink
Attachment 6 <br /> SECOR <br /> Action Level Table For Chemical Monitoring <br /> (Add or delete contaminant from the following table as appropriate for the site). <br /> • The level for respirator use indicated below is that concentration at which a respirator must be put on. It does not require the job to <br /> stop. The respirator is a tool to be used while we determine why the exposure has reached that concentration. Work to reduce the <br /> concentration by engineering controls such as water mist or spray foam or plastic cover, etc. • <br /> • The level for work stoppage indicated below is that concentration at which we must stop the job and determine why exposures have <br /> reached that concentration and how they can be reduced. It does not mean that we must leave the site. Stopping the operations is a <br /> precaution we take to reduce the likelihood that concentration will rise still higher. Following engineering controls to reduce the <br /> concentration, then resume work. <br /> • These values can be modified with particular knowledge of contaminants and site conditions. Contact Director of Industrial Hygiene <br /> & Health and Safety, Philip Platcow to discuss (617)232-7355. <br /> CHEMICAL MONITORING TASK MONITORING LEVEL FOR <br /> (OR CLASS) EQUIPMENT FREQUENCY/ LEVELFOR WORK <br /> LOCATION RESPIRATOR USE STOPPAGE <br /> Volatile Organic FID/PID as appropriate From start of 20 ppm above 50 ppm above <br /> Vapors for chemicals of concern. mobilization to Sampling should be continuous during the <br /> p project while disturbing potentially background sustained in background in <br /> Read manual to completion and breathing zone for 2 breathing zone and <br /> determine. demobilization contaminated pip soil or uncovering/removingring. At minutes,and no benzene no vinyl chloride or <br /> tanks and piping,or during drilling. e.least and/or vinyl chloride benzene tube <br /> Draeger Tube for vinyl every 15 minutes in the breathing zone. tube discoloration. If a discoloration. Stop • <br /> chloride(model 1/a part Sample in at the exclusion zone boundaries color change appears on work if tube <br /> number 67 28031). every 30 minutes. Continuously sample tube for benzene or vinyl indicates> ]ppm <br /> during each soil and groundwater sampling chloride at 10ppm on for benzene or vinyl <br /> Draeger Tube for benzene interval. If 10 ppm in breathing zone,collect FID/PID,don respirator. chloride. <br /> (model 0.5/a). a Draeger tube for benzene and/or vinyl <br /> chloride(depending upon contaminants of If no Draeger Tubes are If no Draeger Tube <br /> concern). available,the level for available,stop work <br /> respirator use will be 5 at 25 ppm. <br /> ppm. <br /> SECOR International Incorporated 31 Generic HASP <br />