My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1616
>
2900 - Site Mitigation Program
>
PR0521933
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:32:53 PM
Creation date
1/29/2020 4:26:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521933
PE
2950
FACILITY_ID
FA0014912
FACILITY_NAME
COSTCO WHOLESALE
STREET_NUMBER
1616
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1616 E HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> HEALTH AND SAFETY PLAN <br /> Project No.: 34067 Date: September 5, 2003 <br /> Client: CosteoBarghausen Consulting Address: 18215 72"d Avenue South <br /> Kent, WA 98032 <br /> Client/Site Contact: NA Client/Site Phone No.: <br /> Job Location: 1616 East Hammer Lane <br /> Work Objectives: Advance four soil borings using hollow-stem auger drilling equipment and <br /> sample soil and groundwater for petroleum hydrocarbons. <br /> Key Individuals-------- Project Manager: Steve Walker 925-484-1700 x225 <br /> Site Health and Safety: Pamela Llewellyn <br /> Preparer: Pamela Llewelleyn <br /> Reviewer/Approver: Steve Walker <br /> Hospital/Clinic: San Joaquin General Hospital Phone No.: 209-468-2066 <br /> Hospital Address: 2420 North California St. (a map to the Hospital from the site is attached to <br /> this plan) <br /> Paramedic: 911 Fire Dept.: 911 Police Dept.: 911 <br /> Emergency/Contingency Plan: Stop work and evaluate situation. Shut off any machinery. <br /> Render first aid as needed Call 911 or transport to hospital as necessary. All Emergencies shall <br /> be documented and reported to the Project Manager and the Company Health and Safety Officer. <br /> 15 Minute Eyewash X Fire Extinguisher X First Aid Kit X <br /> Site Control Measures: Verbal warnings to unauthorized personnel. Install barricade tape to <br /> define the work zone as necessary. <br /> Personal Decontamination Procedures: Wash hands face and exposed skin with soap and <br /> water prior to eating drinking smoking or other hand to face contact and prior to leaving site. <br /> U:ISWALKERIProjectslstcktonHSP.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.