Laserfiche WebLink
Y I , • • • <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> On-site communications: ❑ Radio I] Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio I@ Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: Parking Lot <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated personal protective equipment lie gloves coveralls) will be placed in drums and <br /> with the drill cuttings. <br /> Location of Wash Water: Restaurant across Hammer Ln. <br /> Location of Toilet: Restaurant across Hammer Ln. <br /> Location of Drinking Water: Restaurant across Hammer Ln. <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium phosphate <br /> solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All drill cuttings and water produced will be <br /> stored on-site until appropriate disposal <br /> methods are determined. <br /> PAGE 8 <br />