My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SOIL MANAGEMENT PLAN AND EXCAVATION WORK PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0537774
>
ARCHIVED REPORTS_SOIL MANAGEMENT PLAN AND EXCAVATION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:59:37 PM
Creation date
1/29/2020 4:44:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SOIL MANAGEMENT PLAN AND EXCAVATION WORK PLAN
RECORD_ID
PR0537774
PE
2950
FACILITY_ID
FA0021779
FACILITY_NAME
FED X GROUND TRACY PROJECT
STREET_NUMBER
24550
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
24550 S HANSEN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r y <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION...................................................................................................................1 <br /> 2.0 SOIL MANAGEMENT PLAN..............................................................................................1 <br /> 2.1 SUMMARY OF SITE CONDITIONS...............................................................2 <br /> 2.2 ROLES AND RESPONSIBILITIES....................................................................3 <br /> 2.3 NOTIFICATION.................................................................................................4 <br /> 2.4 PROFILING AND MANAGEMENT...............................................................5 <br /> 3.0 EXCAVATION WORK PLAN..............................................................................................6 <br /> 3.1 PRE-FIELD PROTOCOL....................................................................................6 <br /> 3.1.1 CONTRACTOR PROCUREMENT..................................................................6 <br /> 3.1.2 PERMITS..............................................................................................................7 <br /> 3.1.3 SITE HEALTH AND SAFETY PLAN..............................................................7 <br /> 3.1.4 SURVEY...............................................................................................................7 <br /> 3.1.5 UTILITY CLEARANCE.....................................................................................7 <br /> 3.2 EXCAVATION PROCEDURES........................................................................8 <br /> 3.3 SOIL VERIFICATION SAMPLING PROCEDURE........................................9 <br /> 3.4 SOIL STOCKPILES.............................................................................................9 <br /> 3.5 EXCAVATION BACKFILLING......................................................................10 <br /> 3.6 REPORTING......................................................................................................10 <br /> 3.7 SCHEDULE.......................................................................................................10 <br /> 060223(33) CONESTOGA-ROVERS&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.