My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WELL DESTRUCTION WORK PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0537774
>
ARCHIVED REPORTS_WELL DESTRUCTION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 6:02:24 PM
Creation date
1/29/2020 4:45:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WELL DESTRUCTION WORK PLAN
RECORD_ID
PR0537774
PE
2950
FACILITY_ID
FA0021779
FACILITY_NAME
FED X GROUND TRACY PROJECT
STREET_NUMBER
24550
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
24550 S HANSEN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> Conestoga-Rovers & Associates (CRA) prepared this work plan on behalf of Equilon <br /> Enterprises, LLC dba Shell Oil Products US (Shell) for proper destruction of the monitoring <br /> wells for the Former Shell Central Valley Crude Oil Pipelines project located at Cordes Ranch in <br /> Tracy,California site(Figures 1 and 2). <br /> The destruction of all site wells is necessary to support the land development activities <br /> occurring in the near future. The well destruction work was discussed in an April 23,2014 <br /> meeting with the Central Valley Regional Water Quality Control Board (RWQCB), where Shell <br /> received verbal concurrence from the RWQCB for well destruction to support land <br /> development. A conceptual replacement monitoring well network as part of a long-term <br /> monitoring plan and schedule will be submitted to the RWQCB. The long term monitoring <br /> plan will based on the assessments results detailed in the delineation work plan currently under <br /> review by the RWQCB, and further refinement of the Lot 1 and Lot 2 development plans by the <br /> developers. The proposed scope of work is written to comply with San Joaquin County <br /> Environmental Health Department(EHD)guidelines. <br /> 2.0 WORK PLAN <br /> 2.1 PERMITS <br /> CRA will obtain well destruction permits from the EHD prior to starting field work. <br /> 2.2 HEALTH AND SAFETY PLAN(hasul <br /> CRA will prepare a HASP to protect site workers. The HASP will be kept on site during field <br /> activities and will be reviewed and signed by each site worker. <br /> 2.3 UTILITY CLEARANCE <br /> CRA will mark the proposed work locations, and the locations will be cleared through <br /> Underground Service Alert and a private utility locating service prior to performing well <br /> destruction activities. <br /> 050223(32) 1 CONESTOGA-ROVERS&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.