Laserfiche WebLink
% P" i.r✓ <br /> RESNA <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> i <br /> Taskl � . . Haxar IIArtlgatronlA�asure.. : <br /> 1 Heavy Equipment (Noise &Physical AM heavy equkmem used on this project will be <br /> contact) in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Tide 8,Subdrapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone apples to all personnel. The <br /> exdusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> Am equipment operators and ground crews <br /> working in dose proximity of heavy equipment <br /> will be suppled with ear protection. <br /> 1 <br /> Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located down wind <br /> of drrTng and excavation activity. In addrd <br /> water will be applied to control the dust if <br /> visible levels of dust are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> larrrYs6le(F1$sh Point Card [E18h Pont':<200°F) <br /> NIA NIA <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> RESNA ipersonnel will carry a 5- ound ABC fire extin wisher in their vehicle when visitina the site. <br /> PAGE 4 <br />