My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:04:41 AM
Creation date
1/30/2020 8:25:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STA-E OF CALIFORNIA <br /> GEORGE DEUKMEJIAN Govp,no- <br /> CALIFORNIA REGIONAL WAT QUALITY CONTROL BOARD— <br /> CLNTRAL VALLEY REGION C9,3443 ROUTER ROADSACRAMENTO, CA95827-3098 <br /> 16 December 1988 <br /> Mr. Ted Knowles 6 <br /> Knowles Plaza 10'' <br /> 1140 West Hammer Lane <br /> Stockton, CA 95207 <br /> PROBLEM ASSESSMENT REPORT (PAR) WORK PLAN FOR FORMER KNOWLES GAS <br /> STATION AT 1140 WEST HAMMER LANE, STOCKTON <br /> Thank you for having Groundwater Technology, Incorporated (GTI) <br /> submit the 22 November 1988 PAR work plan for our review. I <br /> discussed this work plan with Mr. James Grasty of GTI and we <br /> agreed on a minor change in the location of one of the proposed <br /> monitoring wells (see enclosed map) . <br /> We find the revised work plan acceptable. Necessary permits to <br /> conduct the work are to be issued by the San Joaquin Local Health <br /> District (SJLHD) . The PAR is to be prepared in the format <br /> specified in the Regional Board Staff Recommendations for Initial <br /> Evaluation and Investigation. of Underground Tanks, Appendix A, <br /> pages A-9 through A-11 (enclosed) . The PAP. is to be completed <br /> and submitted to us and the SJLHD by 3 March 1989 . <br /> Following our 5 December 1988 telephone conversation, I discussed <br /> your Soil Remediation Proposal (SRP) time schedule with <br /> Mr. Grasty. We agreed that you have sufficient information to <br /> develop the SRP and because ground water levels are low, it <br /> should be developed on the original time schedule for submittal <br /> to us and the SJLHD by 30 December 1988 . Include in the SRP map <br /> and cross-sectional views delineating the extent of soil <br /> contamination using all available soil data. <br /> If you have any questions, call me at (916) 361-5725. <br /> EDWARD W. JAMES <br /> Engineering Geologist <br /> Enclosures (2) <br /> cc: Ms. Laurie Cotulla, San Joaquin Local Health District, <br /> Stockton w/o enclosures <br /> Mr. James Grasty, Groundwater, Technology, Incorporated, <br /> Sacramento w/o enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.