My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:04:41 AM
Creation date
1/30/2020 8:25:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)TATE OF CALIFOPNIA GEORGE DEUKMEJIAN,Governor <br /> CALIFORNIA REGIONAL WATEI . JALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROADf <br /> SACRAMENTO,CA 95827-3098 '? J <br /> 26 May 1988 O <br /> J U N 3 1988 <br /> Mr. Ted Knowles <br /> ENVIROMENTAL HEALTH 1140 West Hammer Lane PERMIT/SERVICES <br /> Stockton, California 95207 <br /> KNOWLES GAS STATION, 1140 WEST HAMMER LANE, STOCKTON <br /> The following letter is in response to the 26 May 1988 meeting <br /> between Regional Water Quality Control Board (RWQCB) staff, you, <br /> your consultant (Groundwater Technology Incorporated (GTI) ) , and <br /> a representative from the San Joaquin Local Health District (Ms. <br /> Laurie Cotulla) . A number of issues regarding the assessment of <br /> groundwater and soil problems and new construction at your site <br /> were discussed and are summarized in the enclosed memo. <br /> Construction of the new facility is acceptable provided you <br /> perform the following tasks: <br /> 1. Submit current construction plans for the new facility <br /> along with an overlay or superposition of former tank/product <br /> lines/pump islands within 14 days of receipt of this letter. <br /> 2 . Tmplement the 3.7 February 1988 GTI workplan which includes <br /> one deep soil boring at the old tank pit, hand auger borings <br /> along the old product lines and pump islands, monthly <br /> monitoring of water levels to determine the local groundwater <br /> gradient, and quarterly sampling of the three monitor wells. <br /> 3 . Submit a complete Preliminary Report, as outlined in the <br /> enclosure, including results of the GTI propcsed soil boring <br /> and hand auger borings within 45 days of receipt of this <br /> letter (but no later than 22 July 1988) . <br /> 4 . Submit a letter to the Regional. Water Board and San Joaquin <br /> Local Health District within 30 days of local agency + <br /> approval of your construction plan which includes: <br /> a. A commitment to define the lateral and vertical extent of <br /> soil and ground water contamination, if needed, from your <br /> facility and prepare a Problem Assessment Report, as <br /> outlined in the enclosure, if needed. <br /> b. A uonmi.t_nenL to remediate soil , if necessary, install <br /> necessary- remediation equipment, and perform necessary <br /> excavations, <br />
The URL can be used to link to this page
Your browser does not support the video tag.