My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:21:34 AM
Creation date
1/30/2020 8:34:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDWATER TECHNOLOGY <br /> STANDARD OPERATING PROCEDURE <br /> CONCERNING SOIL SAMPLE COLLECTION AND <br /> HANDLING WHEN SAMPLING FOR VOLATILE ORGANICS <br /> SOP 15 <br /> 1 . Use a sampling means which maintains the physical <br /> integrity of the samples . The project sampling protocol <br /> will designate a preferred sampling tool. A split spoon <br /> sampler with liners or similar tube sampler which can be <br /> sealed is best. <br /> 2 . At the discretion of the project manager, the samples <br /> should be either. <br /> A. sealed in liner with teflon plugs (The "California <br /> Sampler" ) or <br /> B. field prepped for sample analysis. <br /> Projects using method (A) will incur a separate sample <br /> preparation charge of $ 10 . 00 per sample in the labora- <br /> tory. For method (B ) , prepared and pre-weighed vials , <br /> and sample coring syringes must be ordered at least 2 <br /> weeks ahead of time from the laboratory before sampling. <br /> (Vials are free if samples will be sent to Groundwater <br /> Technology Laboratory) . <br /> 3 . For sending whole-core samples ( 2A above ) : <br /> A. Seal ends of liner with teflon plugs leaving no <br /> free air space inside. <br /> B. Tape with duct tape. <br /> C. Cover with a non-contaminating sealant (paraffin ) . <br /> D. Place in plastic bag labeled with indelible marker . <br /> Use Well # , depth, date, and job # . <br /> E. Place inside a second bag and place a labelling tag <br /> inside outer bag. <br /> F. Enclose samples in a cooler with sufficient ice or <br /> dry ice to maintain samples at 4 degrees during <br /> shipment. <br /> G. Seal cooler with a lock or tape with samplers <br /> signature so tampering can be detected. <br /> H. Package cooler in a box with insulating material . <br /> Chain of custody forms can be placed in a plastic <br /> bag in this outer box. <br />
The URL can be used to link to this page
Your browser does not support the video tag.