My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:21:34 AM
Creation date
1/30/2020 8:34:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW <br /> San Joaquin Local Health District ,.' f <br /> 202/799-5005 . 01 Vdf 1 <br /> June 17 , 1988 <br /> Page 2 JUN 2 0 L089 <br /> CRWQCB-V) , GTI proposes to implement the �o � OMENTAL HEAM steps : <br /> Drill one deep soil boring and ten shallow borings to <br /> determine the presence and/or extent of soil contami- <br /> nation ( if encountered) through laboratory analyses of <br /> selected soil samples . <br /> Survey the existing well heads for elevation control to <br /> be used in conjunction with monitoring data to de- <br /> termine water level fluctuations, an estimated ground- <br /> water flow direction, and the local groundwater <br /> gradient . <br /> Collect water samples from the existing monitoring <br /> wells and submit to an analytical laboratory for <br /> analysis . <br /> Prepare a "Preliminary Report" following the CRWQCB-V <br /> guidelines that will include data from the afore- <br /> mentioned work steps and all work to date. <br /> WORK STEPS <br /> One deep soil boring would be drilled with a truck-mounted drill <br /> rig using 8-inch diameter hollow-stem augers . The boring would <br /> be completed to a maximum depth of 50 feet below surface grade <br /> and logged by a GTI geologist using the Unified Soil Clas- <br /> sification System (see Appendix I ) . The boring would be located <br /> in the middle of the old tank pit (see Figure 2 , Site Plan) . <br /> Soil samples from the boring would be collected during drilling <br /> at approximately 5-foot intervals, beginning at 5 feet below <br /> surface grade . Samples would be obtained using a 2 . 5-inch <br /> outside diameter (O .D . ) split-spoon sampler, lined with three 2- <br /> inch diameter by 6-inch long brass sample tubes . The sampler <br /> will be driven 18 inches ahead of the augers at each sample <br /> point . Each sample would be field screened by visual obser- <br /> vation and with a Photovac TIP photo-ionization detector (PID) . <br /> The collected samples will be sealed, capped, and placed on ice <br /> in an insulated cooler for subsequent delivery to an analytical <br /> laboratory accompanied by a Chain-of-Custody manifest . <br /> Ten shallow soil borings would also be drilled with the same <br /> equipment used to drill the deep boring. The borings would be <br /> completed to depths less than 5 feet below surface grade . The <br /> borings would be located in the vicinity of the old pump islands <br /> and product delivery lines (see Figure 2 ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.