My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012707
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
ARCHIVED REPORTS_XR0012707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 12:35:39 PM
Creation date
1/30/2020 8:40:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012707
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t� <br /> I 1 <br /> sampling, latex gloves will be worn to prevent cross <br /> contamination with other samples. One pair of disposable <br /> gloves will be dedicated to each sample collected. <br /> Once the sample is collected, each end of the cylinder will <br /> be sealed with aluminum foil or teflon tape and then capped <br /> with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziploek bag and <br /> Immediately placed in an ice chest containing dry ice or <br /> frozen chemical ice for delivery to a state certified <br /> laboratory. Sample identification, storage and <br /> transportation will be conducted as outlined in the previous <br /> section. <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from <br /> _. excavated material in the manner described in the previous <br /> section, however, a backhoe will not be utilized, if <br /> composite samples are collected, four brass cylinders will <br /> be collected for every 50 cubic yards of material to be <br /> sampled unless otherwise specified by the lead regulatory <br /> agency. The samples will be composited by the state <br /> a certified analytical laboratory E <br /> 6 ry personnel prior to testing. <br /> P 12.0 Groundwater Sampling Protocol <br /> Prior to arriving at the sampling site, all sampling <br /> equipment will be washed with laboratory grade detergent, <br /> and rinsed twice with tap water, once with acetone, and once <br /> # with deiotized water. This procedure will be carried out <br /> ? on-site before sampling of other monitoring wells, if more <br /> � . than one well is to be sampled with the same sampling <br /> device. <br /> f , . <br /> � <br /> Immediately y prior to sampling, the depth to water (DTW) in <br /> the well will be recorded. The thickness of product on top <br /> of the groundwater, if present, will be measured using an <br /> interface probe. The procedure for monitoring is presented <br /> in Section 9.0 (Groundwater Monitoring Protocol). <br /> If free product is detected, analysis of groundwater at the <br /> Interface for dissolved product will not be conducted. . A <br /> Product sample will be collected for source identification. <br /> If all free product cannot be removed, an interval specific <br /> sampling device may be utilized to collect a sample from <br /> below the zone of_free_Product. --Before collecting at least <br /> two groundwater samples from each well, the <br /> -- <br /> well will :he <br /> i <br /> purged until indicator parameters .(temperature, conductivity <br /> and pH) stabilize. This will entail the removal of .at least" <br /> four well casing volumes by bailing or Pumping. The <br /> criteria for determining well casing volumes and temporary <br /> storage of purged wester is outlined in Section 10.0, (well <br /> Development Protocol) The indicator parameter measurements <br /> will be taken both: before and after purging of each well <br /> W <br />
The URL can be used to link to this page
Your browser does not support the video tag.