My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002060 - 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
ARCHIVED REPORTS_XR0002060 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 10:00:52 AM
Creation date
1/30/2020 8:48:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002060 - 1
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aw- <br /> DROP TUBE - 3/4"REINFORCED j <br /> ISOTFC REAGENT INJECTION PROQE,U,QRF (3/+'�) 3/4"POLY HOSE POLY HOSE <br /> ISOTEC INJECTION <br /> Air Operated Double PI WELL—HEAD <br /> 1.) DROP TUBE IS PLACED IN WATER TANK _ _ Diaphragm Pump <br /> AND PUMP IS ACTIVATED. ,/// r <br /> 2.) DROP TUBE THEN PLACED IN OXIDIZER TANK, i1 <br /> CONTINUE INJECTIONS. r H <br /> 3.) WATER FLUSH IS INITIATED AT COMPLETION p if <br /> OF OXIDIZER INJECTIONS <br /> 4.) DROP TUBE IS MOVED TO CATALYST TANK, <br /> CONTINUE INJECTIONS <br /> 5.) FINAL WATER FLUSH IS COMPLETED <br /> t-25" or 1-5" (O.D.)STAINLESS STEEL <br /> GED—PROBE ROD <br /> 0.8"(O.D.)STAWLESS STEEL ' <br /> ISOTEC SCREEN (8'In length) - <br /> I <br /> 1 <br /> CATALYST TANK PROCEDURES WATER TANK PROCEDURES OXID47FR TANK POCEDURES <br /> TRANSFER 14202 <br /> ADD TO WALYST INTO=DGER <br /> __ TANK COKTNNMO ADO STABIUM R <br /> A <br /> (-�-TANK BY HANG X WATER ANO STABIifZEIt-__0;_—_... TO OxKER NYTANK <br /> � WITH AN AIR OPERATED BY NAND <br /> O kPHRAGM PUMP <br /> i r ---------w I TRANSFER WATER I I r--"--'-"P"""----� POLY TANK(TYP•) <br /> r___ TO WATER TANK ""1 I <br /> MOI WAITER I ® <br /> CAT WATER N i <br /> CATALYST TNI% I <br /> WMi MUONG MOTOR 'pANO <br /> Of <br /> ON 0_U W 7Ld UJ�M7 0.'W �U <br /> liV H� W� 1pL'CM La <br /> oN 3� WATER ¢moo o 3 OXIDIZER <br /> CATALYST ") <br /> oL <br /> LEGEN <br /> d <br /> FLOW METER WITH TOTALIZER 3/4' BALL VALVE WITH CAM LOCK <br /> v a QUICK CONNECT AND PRESSURE GAUGE <br /> SCALE: PROJECT# <br /> Iia 3/4" BALL VALVE WITH CAM in-Situ Oxidative Not To Scale <br /> LOCK QUICK CONNECT <br /> Technologies, Inc. DAT10/25/45 904755 <br /> 5600 South Quebec SL,Suite 320D DRAWN BY: MT <br /> Greenwood Village,Colorado 80111 CHECKED BY: SH <br /> FIGURE# <br /> Injection Method Schematic <br /> Knowles Property 1 <br /> Stockton, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.