Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request 11/21/05 Requested Completion Date 11/22/05 <br /> Prod Name Knowles Hammer Lane Prod No 95-013 <br /> Site Address 1140 West Hammer Lane Stockton Ca <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Patrick Riddle Phone No 209-367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 209-468-3442 <br /> Approval �V� Completion Date /1 hLa)a r .e f Er <br /> Notify regulator and client 48 hours rior to arrivm on site Done JPL 11/17/05 <br /> _Make sure all downhole equipment, including_pumps and W/L probe, are <br /> thoroughly deconned prior to arriving on site <br /> • Monitor DTW/DTB all wells In order <br /> MW9, 2, 3, 4, 1, 5 is the order_ <br /> Purge and sample well MW5 <br /> Sample for BTEX/TPHg <br /> Samples to Argon Labs Put on chain of custody that EDF reports are required. <br /> Wells are about 70 feet deep Water is at —39-40 feet Wells are two inch <br /> Drums are located in rear of store You can reuse the drums from wells 2,3,4,9 <br /> from last round as they were all ND <br /> Clearly label each drum as dedicated for particular well with date of purged water <br /> and approximatealg lons per date <br /> Purge 3 to y_ casing volumes, BUT NO MORE Average_purgevolume will be <br /> approximately 10-14 gallons <br /> Store all drums in rear of store <br /> Take a detailed drum count <br /> workreglknoliam doe <br />