Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request 08/19/05 Requested Completion Date 08/23/05 <br /> Prod Name Knowles Hammer Lane Prod No 95-013 <br /> Site Address 1140 West Hammer Lane, Stockton Ca <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Patrick Riddle Phone No 209-367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 209-468-3442 <br /> Approval Com letion Date e.3% /tr c - <br /> rr r � <br /> Notify regulator and client 48 hours p_rlor to arriving onsite <br /> Make sure all downhole equipment, including_pumps and W/L probe, are <br /> thoroughly deconned prior to arriving on site <br /> Monitor DTW/DTB all wells In order <br /> MW9, 2, 3, 4, 1, 5 is the order <br /> Purge and sample well MW5 <br /> Sample for BTEX/TPH,g <br /> Samples to Argon Labs Put on chain of custody that EDF reports are required. <br /> Wells are about 70 feet deep Water is at —39-40 feet Wells are two inch <br /> Drums are located in rear of store You can reuse the drums from wells 2,3,4,9 <br /> from last round as they were all ND <br /> Clearly label each drum as dedicated for particular well with date of purged water <br /> and approximate gallons per date <br /> Purge 3 to 5 casing volumes BUT NO MORE Average purge volume will be <br /> approximately 10-14alg _lons <br /> Store all drums in rear of store <br /> Take a detailed drum count <br /> A%0rkreg16noham dor <br />