Laserfiche WebLink
WORK REQUEST FORM <br /> JZ- <br /> Date of Request 05/11/04 Requested Completion Date 05/4-t/04 <br /> Proj Name Knowles Hammer Lane Proj No 95-013 <br /> Site Address 1140 West Hammer Lane, Stockton Ca <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Patrick Riddle Phone No 209-367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 209-468-3442 <br /> Approval �! I� Completion Date 051/3-/YJ F Chc <br /> Notify regulator and client 48 hours prior to arriving,on site <br /> Make sure all downhole equipment, including_pumps and _W/L probe, are <br /> thoroughly deconned prior to arriving on site <br /> Monitor DTW/DTB all wells In order <br /> MW2, 3, 9, 4, 1, 5 is the order <br /> Purge and sample wells M_W9,. 4, 1, 5 in order <br /> Sample for BTEX/TPHg_ <br /> Samples to Argon Labs Put on chain of custody that EDF reports are required. <br /> Wells are 70 feet deep Water is at —38-40 feet Wells are two inch <br /> Drums are located in rear of store. Use separate/existing separate/existingdrums for each well if <br /> p.2ssible If you must combine wells 5,1 in one drum You can reuse the drums <br /> from wells 3,4,9 from last round as they were all ND <br /> Clearly label each drum as dedicated for particular well with date„of purged water <br /> and approximatealb lons per date. <br /> Purge 3 to 5 casing volumes, BUT NO MORE _Average_purge volume will be <br /> approximately 10-14 gallons <br /> Store all drums in rear of store <br /> Take a detailed drum count <br /> i <br /> wor&regUoham doe <br />