Laserfiche WebLink
WORK REQUEST FORM <br /> i <br /> Date of Request 08/05/03 Requested Completion Date 08/12/03 <br /> Prod Name Knowles Hammer Lane Prod No 95-013 <br /> Site Address 1140 West Hammer Lane Stockton Ca <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Patrick Riddle Phone No 209-367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 209-468-3442 <br /> cam- rr <br /> Approval g � Completion Date 07`/� ).-/D-3 r <br /> Notify regulator and client 48 hours 12rior to airiving on site <br /> Make sure all downhole equipment, including pumps and W/L probe, are <br /> thoroughly deconned prior to arriving on site <br /> Monitor DTW/DTB all wells In order <br /> _MW2, 3, 4, 1, 5 is the order <br /> Pure and sample wells MW2 3 4 1 5 in order <br /> Sample for BTEX/TPHg- <br /> Sam les to Argon Labs Put on chain of custody that EDF reports are required. <br /> Wells are 70 feet deep Water is at —33-35 feet Wells are two inch <br /> Drums are located in rear of store Use separate/existing separate/existingdrums for each well if <br /> possible If you must, combine wells 5,1 in one drum <br /> Clearly label each drum as dedicated for particular well with date of purged water <br /> and approximate gallons per date <br /> Pure 3 to 5 casing volumes BUT NO MORE Average purge volume will be <br /> approximately 10-14 gallons <br /> Store all drums in rear of store <br /> Take a detailed drum count <br /> worl.req\knoham doc <br />