My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2900 - Site Mitigation Program
>
PR0505722
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 10:46:58 AM
Creation date
1/30/2020 9:58:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505722
PE
2951
FACILITY_ID
FA0006961
FACILITY_NAME
KJAX
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Woodward-Clyde <br /> f <br /> Ms. Diane Hinson <br /> San Joaquin County Environmental Health Division _ <br /> February 23, 1996 - p <br /> Page 5 <br /> Task 4-Loading,Transporting,and Disposing of Contaminated Soil- <br /> i <br /> Based on the site characterization findings,:it is'assumed that approximately 16 cubic yards of diesel <br /> contaminated soil will be removed from the site. The contractor will load, transport, and dispose of all!I <br /> diesel contaminated soil generated during re-excavation-activities. The soil will be taken to Forward <br /> Incorporated Landfill of Stockton, California. <br /> Task 5-Tank Closure Report <br /> WCFS will prepare a tank closure report describing the proposed work explained in this work plan.; <br /> - -The report will include a site map showing soil sample locations, a summary of sample analysis results„J <br /> documentation of contaminated soil disposal, and the request for site closure. <br /> - _ I <br /> SCHEDULE- <br /> ' <br /> The remedial activities will begin after this work plan has been approved by the SJCEHD, all applicable; <br /> permits are obtained, and an excavation contractor has been contracted. <br /> If you have any questions regarding this work plan, please call me at (301) 670-3333 or Mr. Bill j <br /> Loskutoff in our Sacramento office at(916)368-0988.- <br /> .Very truly yours, F <br /> W-OODWARD-CLYDE FEDERAL=-SERVICES <br /> ev"A � 0 <br /> Charles R_ Georgius, Jr., CHIVIlM _ <br /> Project Manages - <br /> cc: Joel Gamble(KJAX) <br /> Bill Loskutoff(WCFS-Sacramento) <br /> Attachments: Figure 1 -Location Map <br /> Figure 2- Site Map <br /> Woodward-Clyde Federal Services T <br /> 80541:\c6ntinv.ust\kjax.ca\reports\wkpin.jax — <br />
The URL can be used to link to this page
Your browser does not support the video tag.