Laserfiche WebLink
Woodward-C14" <br /> i <br /> Ms. Diane Hinson <br /> San Joaquin County Environmental Health Division <br /> February 23, 1996 <br /> Page 5 <br /> I <br /> Task 4-Loading, Transporting,and Disposing of Contaminated Soil ` <br /> Based on the site characterization findings, it is assumed that approximately 16 cubic yards of diesel, <br /> contaminated soil will be removed from the site. The contractor will load, transport, and dispose of ally <br /> diesel.contaminated soil generated during re-excavation activities. The soil will be taken to Forward! <br /> Incorporated Landfill of Stockton, California. <br /> i <br /> u <br /> Task 5-Tank Closure Report <br /> WCFS will prepare a tank closure report describing the proposed work explained in this work plan. <br /> The report will include a site map showing soil sample locations, a summary of sample analysis results, <br /> documentation of contaminated soil disposal, and the request for site closure. i <br /> SCHEDULE <br /> The remedial activities will begin after this work plan has been approved by the SJCEHD, all applicable <br /> permits are obtained, and an excavation contractor has been contracted. <br /> If you have any questions regarding this work plan, please call me at (301) 670-3333 or Mr. Bill!1 <br /> Loskutoff in our Sacramento office at(916)368-0988. <br /> Very truly yours, <br /> WOODWARD-CLYDE FEDERAL SERVICES <br /> ;i <br /> Charles R Georgius, Jr., CBMM <br /> Project Manager <br /> cc: Joel Gamble(KJA ) <br /> Bill Loskutoff(WCFS-Sacramento) i <br /> Attachments: Figure 1 -Location Map <br /> Figure 2-Site Map <br /> Woodward-Clyde Federal Services <br /> 8054z:\continv.ust\kjaz.ca\reports\wkpin.jax <br />