Laserfiche WebLink
Beacon Station No.3641 �Wv April 21,2006 <br /> Stockton.Ca'f ia- W <br /> Task S Survey the location and tap-of-casing elevation of the new monitoring well <br /> MW-14 to GeoTracker specifications. <br /> Task 6 Prepare a report documenting the installation of the additional monitoring well <br /> and update the SCM. <br /> Horizon is prepared to implement the tasks outlined in this work plan and upon SJCEHD <br /> approval will begin permitting and scheduling tasks for the project. If you have any <br /> questions, please contact Horizon at(916) 939-2170. <br /> Sincerely, <br /> HORIZON ENVIRONMENTAL INC. <br /> Gary D. Barker �� 44 at p <br /> Senior Proje t Manager , " �(O <br /> c <br /> UU, REXFORD K SMITH <br /> Ne. 53 7 <br /> Rexford K. Smith P.G. No. 53 <br /> Project Manager c ti7� CA���o <br /> Attachments <br /> Figure 1: Site Location Map <br /> Figure 2: Site Plan <br /> Attachment A: San Joaquin County Correspondence <br /> Attachment B: Horizon Environmental Inc. Field Methods and Procedures <br /> Attachment C: Typical Well Construction Diagram <br /> cc: Mr. Michael J. Iilfuma Jr., San Joaquin County Environmental Health Department <br /> Mr. James L.L. Barton, Regional Water Quality Control Board <br /> 641 wp4-o6 <br /> Project No. 1641.19 3 HORIZON ENVIRONMENTAL INC. <br />