Laserfiche WebLink
Beacon Station No. 3641 January 17, 2005 <br /> Stockton, California Quarterly Groundwater Monitoring Report <br /> and the fuel oxygenate methyl-t-butyl ether (MTBE) by Environmental Protection Agency <br /> (EPA) Method 8260B. <br /> Results of Groundwater Monitoring <br /> Depth-to-groundwater measurements were subtracted from the surveyed TOC elevations to <br /> calculate groundwater elevations. Groundwater elevation data, summarized in Table 1, were <br /> used to construct a groundwater elevation contour map (Figure 2). Groundwater level data <br /> indicate flow in the immediate underground storage tank area was variable from eastward to <br /> southeastward under an average gradient of approximately 0.002. <br /> Analytical data are summarized in Table 1. TPHg, benzene and MTBE concentration data <br /> were used to construct isoconcentration maps (Figures 3, 4 and 5). The analytical report is <br /> contained in Attachment C. <br /> GeoTracker Electronic Data Deliverables <br /> The analytical electronic data deliverable (EDD) is uploaded by Kiff. The groundwater well <br /> measurement file EDD (GEO_WELL) for this quarterly monitoring event has been uploaded <br /> by Horizon. The GEO_WELL file upload confirmation sheet is contained in Attachment D. <br /> Recommendations <br /> Horizon recommends continued quarterly monitoring during the ongoing investigatiou and <br /> remediation phases of the project. <br /> Horizon performed an additional groundwater investigation in February 2003. The <br /> investigation report was submitted on July 10, 2003 and included recommendations, as <br /> appropriate, for additional fieldwork to delineate the extent of petroleum hydrocarbons in soil <br /> and groundwater. In September 2004, Ultramar secured right-of-entry agreements with the <br /> off-site property owners to allow installation of additional off-site groundwater monitoring <br /> wells. Installation of the monitoring wells was conducted during the week of October 4, <br /> 2004. The report of the well installations is in preparation. <br /> Vapor extraction and sir sparge systems have been installed at the site. Permitting of the <br /> vapor extraction system (VES) with the San Joaquin Valley Air Pollution Control District <br /> was completed in October 2004. The VES is expected to be started during first quarter 2005. <br /> Distribution <br /> A copy of this report should be forwarded to: <br /> Mr. Michael Infurna Jr., Senior R. E. H. S. <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202-270$ <br /> 641gmrQ404.doc <br /> Project No. 1641.47 2 HORIZON ENVIRONMENTAL INC. <br />