Laserfiche WebLink
Beacon Station No. 3641 July 30,2004 <br /> Stockton California Quarterly Groundwater Monitoring Report <br /> fel. butyl ether (ETBE), tert-amyl methyl ether (TAME), tert-butanol (TBA), methanol, ethanol <br /> Fr r and 1,2-dichloroethane (DCA) by Environmental Protection Agency (EPA) Method 8260B. <br /> Results of Groundwater Monitoring <br /> Depth-to-groundwater measurements were subtracted from the surveyed TOC elevations to <br /> calculate groundwater elevations. Groundwater elevation data, summarized in Table 1, were <br /> used to construct a groundwater elevation contour map (Figure 2). Groundwater level data <br /> indicate flow in the immediate underground storage tank area was variable from <br /> northwestward to southward and southeastward under gradients up to approximately 0.02. <br /> Analytical data are summarized in Table 1. Benzene concentration data were used to <br /> construct a benzene isoconcentration map (Figure 3). Analytical reports and the chain-of- <br /> custody document are contained in Attachment C. <br /> GeoTracker Electronic Data Deliverables <br /> The analytical electronic data deliverable (EDD) is uploaded by Kif£ The groundwater well <br /> measurement file EDD (GEO_WELL) for this quarterly monitoring event has been uploaded <br /> W <br /> by Horizon. The GEO_ ELL file upload confirmation sheet is contained in Attachment D. <br /> Recommendations <br /> 4 _s Horizon recommends continued quarterly monitoring during the ongoing investigation and <br /> remediation phases of the project. <br /> Horizon performed an additional groundwater investigation in February 2003. The <br /> investigation report was submitted on July 10, 2003 and included recommendations, as <br /> appropriate, for additional fieldwork to delineate the extent of petroleum hydrocarbons in soil <br /> and groundwater. In June 2004, Ultramar secured right-of-entry agreements with the off-site <br /> property owners to allow installation of additional off-site groundwater monitoring wells. <br /> Installation of the monitoring wells is scheduled for the week of August 23, 2004. <br /> A site interim remediation system has been installed at the site. The electrical utility <br /> connection is the last remaining item to be completed prior to startup. The remediation <br /> system is expected to be started during the third quarter 2004. <br /> Distribution <br /> A copy of this report should be forwarded to: <br /> Mr. Michael Infurna Jr., Senior R. E. H. S. <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202-2708 <br /> 641 gmrQ204.doc <br /> Project No. 1641.47 2 HORIZON ENVIRONMENTAL INC. <br />