Laserfiche WebLink
rf; Beacon Station No 3641 May 6, 2004 <br /> Stockton California uarterl Groundwater Monitoring Report <br /> . xylenes (BTEX), and the fuel oxygenates methyl tert-butyl ether (MTBE), diisopropyl ether <br /> (DIPE), ethyl-t-butyl ether (ETBE), tert-amyl methyl ether (TAME), tert-butanol (TBA), <br /> methanol, ethanol and 1,2-dichloroethane (DCA) by Environmental Protection Agency <br /> (EPA) Method 8260B <br /> Results of Groundwater Monitoring <br /> Depth-to-groundwater measurements were subtracted from the surveyed TOC elevations to <br /> calculate groundwater elevations Groundwater elevation data, summarized in Table 1, were <br /> used to construct a groundwater elevation contour map (Figure 2) Groundwater level data <br /> indicate flow in the immediate site area was southeastward under a gradient of approximately <br /> 0 005 <br /> Analytical data are summarized in Table 1 Benzene concentration data were used to <br /> construct a benzene isoconcentration map (Figure 3) Analytical reports and the chain-of- <br /> custody document are contained in Attachment C <br /> GeoTracker Electronic Data Deliverables <br /> The analytical electronic data deliverable (EDD) is uploaded by Kiff The groundwater well <br /> measurement file EDD (GEO_WELL) for this quarterly monitoring event has been uploaded <br /> by Horizon The GEO_WELL file upload confirmation sheet is contained in Attachment D <br /> Recommendations <br /> Horizon recommends continued quarterly monitoring during the ongoing investigation and <br /> remediation phases of the project <br /> Horizon performed an additional groundwater investigation in February 2003 The <br /> investigation report was submitted on July 10, 2003 and included recommendations, as <br /> appropriate, for additional fieldwork to delineate the extent of petroleum hydrocarbons in soil <br /> and groundwater Ultramar is in the process of securing right-of-entry agreements with the <br /> off-site property owners to allow installation of additional off-site groundwater monitoring <br /> wells <br /> The Stockton Building Department has approved a permit to install the site interim <br /> remediation system The application for electrical and natural gas utility connections has <br /> been processed by Pacific Gas and Electric Company and Ultramar has finalized the contract <br /> to have the utilities installed Work will be initiated to install the remediation systems after <br /> Ultramar completes the contractor selection process <br /> 641gmrQ104 doc <br /> Project No 1641 47 2 HORIZON ENVIRONMENTAL INC. <br />