Laserfiche WebLink
r� u� @3 <br /> Beacon # 641 page 2 <br /> 1210 E. Hammer Lane, Stockton, <br /> COMMENTS AND CONDITIONS <br /> • Interim remedial action NOT directed by EHD and evaluation of <br /> effectiveness required by EHD (not longer than six months from <br /> system start up) and prior to SVE being considered as full remedial <br /> action and, <br /> • Existing wellheads on and offsite in disrepair Traffic boxes broken, <br /> grout missing Inside boxes, and watertight caps missing and <br /> ineffective at all wells as evidenced by surface drainage s61ning ; <br /> inside of casings. Immediate wellhead protection required. Locking <br /> watertight carps for all wellheads to be installed immediately <br /> • Grouting and traffic box repairs to be included in Phase If as piping <br /> and system connections are completed <br /> • Submit EHD weft permit appitcattons, fees, and offsite access <br /> agreement prior to scheduling CPT start date <br /> • Submit SJCU-APCD permit to construct and to operate to EHD when <br /> issued <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN [H&S 25299 37, <br /> subd(c)(3)] <br /> • none <br /> DATED September 24, 2002 BY <br /> Michael Infurna, Senkr RENS (209)468-3454 <br /> [X] - Faxed to consultant on Q z�1 ay <br />