My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002031
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:16:41 PM
Creation date
1/30/2020 10:42:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002031
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HORIZON ENVIRONMENTAL INC. <br /> SpecialistM Site Assessment Remedial Testing Design and Operation <br /> L <br /> PRELIMINARY RESULTS OF <br /> ADDITIONAL SUBSURFACE INVESTIGATION <br /> AND WORK PLAN ADDENDUM <br /> at <br /> Beacon Station No 3641 <br /> 1210 East Hammer Street <br /> Stockton, California <br /> INTRODUCTION <br /> At the request of Ultramar Inc (Ultramar) Horizon Environmental Inc (Horizon) has <br /> prepared this preliminary results report and work plan addendum for the Beacon Station No <br /> 3641 in Stockton, California (Figure 1) This report documents performance and results of a <br /> preliminary phase of an additional subsurface investigation for delineation of the lateral and <br /> vertical extent of dissolved hydrocarbons in groundwater at the site The report also <br /> includes a proposal for additional site groundwater monitoring wells to complete the <br /> delineation of the vertical and deep lateral extent of groundwater impacts The results of the <br /> total investigation shall be used to prepare a Problem Assessment Report (PAR) and a <br /> Corrective Action Plan (CAP) <br /> The additional investigation at the site was proposed by Horizon in Work Plan for <br /> Additional Groundwater Investigation and Installation of Interim Soil Vapoi Extraction <br /> System dated September 9, 2002 The work plan was approved by the San Joaquin <br /> Environmental Health Department (SJEHD) in a letter dated September 24, 2002 (Appendix <br /> A) This report and work plan addendum is intended to comply with the Regional Water <br /> Quality Control Board Tri Regional Guidelines, and the SJEHD guidelines <br /> 5011 Golden Foothill Parkway Suite 7 . FI Dorado Hills CA 95762 . (916) 939-2170 • FAX (916) 939-2172 <br /> P 0 Box 5283 • Bakersfield CA 93388 (661) 589-8389 • FAX (661) 589-1456 <br />
The URL can be used to link to this page
Your browser does not support the video tag.