My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002031
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:16:41 PM
Creation date
1/30/2020 10:42:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002031
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Horizon's Field Methods and Procedures <br /> 100 cubic yards of soil All samples collected will be prepared and chilled for transport under <br /> Chain-of-Custody protocol, and sent to a State-certified laboratory for the analyses requested <br /> . 40 GROUNDWATER GRAB SAMPLES <br /> Groundwater grab samples will be obtained from the excavation using a clean disposable bailer <br /> The samples will be transferred to appropriate clean containers in such a manner as to minimize loss <br /> of volatile constituents, so that there is no headspace in the sample container and air bubbles are not <br /> present in the samples when they are inverted If air bubbles are found, resampling will occur The <br /> samples will be refrigerated and transported promptly to the laboratory <br /> 5.0 SOIL BORING AND SOEL SAMPLING PROTOCOL <br /> Soil borings and soil sampling will be performed under the supervision of a Horizon geologist The <br /> soil borings will be advanced using a truck-mounted hollow-stem auger drilling rig <br /> To reduce the chances of cross-contamination between boreholes, downhole drilling equipment and <br /> sampling equipment will be steam-cleaned ,between borings To reduce cross-contamination <br /> between samples, the split-barrel sampler will be washed in a soap solution and double-rinsed <br /> between each sampling event <br /> Soil sampling will be conducted in accordance with ASTM 1586-84 Using this procedure, a split- <br /> barrel sampler (California-type sampler) lined with brass sample sleeves is driven into the soil at <br /> approximately 5-foot intervals by a 140 pound weight falling 30 inches The number of blow counts <br /> required to advance the sample 18 inches will be recorded at each sample interval <br /> Upon recovery, a portion of the soil sample will be placed in a plastic bag and sealed for later <br /> screening with an hNu type organic vapor meter(OVM) Another portion of the soil sample will be <br /> used for classification and description Generally, the bottom sample will be sealed in the brass <br /> sleeve and stored at approximately 4°C for transport to the laboratory After the portion of the soil <br /> sample is placed in the plastic bag, it will be allowed to warm, inducing volatilization of petroleum <br /> hydrocarbon vapors The headspace vapors will be screened with the OVM The highest observed <br /> reading will be recorded on the boring logs <br /> 60 GROUNDWATER DEPTH EVALUATION <br /> Depth to groundwater will be measured to the nearest 0 01-foot using an electronic hand held water <br /> level indicator The tip of the probe will be examined to evaluate whether a product sheen is <br /> present <br /> 70 MONITORING WELL DEVELOPMENT/PURGING AND SAMPLING <br /> Following installation, the wells will be surged with a surge block to remove fines from the sand <br /> pack After surging, ten casing volumes of groundwater will be purged from each well using a <br /> bailer or centrifugal pump to remove sediment and enhance representative sample quality <br /> Groundwater sampling events conducted after the initial well development will be preceded by <br /> purging a minimum of three well casing volumes as described above Purge water will be <br /> monitored for the parameters temperature, pH, and conductivity until stabilized Wells will <br /> recharge to 80% before sampling If wells dewater, they will be allowed to recharge for a minimum <br /> of one hour prior to sampling <br /> HORIZON ENVIRONpAMNTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.