My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002048
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:06:08 PM
Creation date
1/30/2020 10:51:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002048
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ultramar <br /> Ultrarnar,Inc Telecopy 209-585 5685 Credit <br /> PO Box 466 209-583 3330 Administrative <br /> 525 W Third Street 209 583 3302 Information Services <br /> Hanford,CA 93232 0466 209-583 3358 Accounting <br /> (209)582 0249 <br /> DATE REPORT SUBMITTED November 11, 1999 <br /> QUARTER ENDING September 30, 1999 <br /> SERVICE STATION NO 641 <br /> ADDRESS 1210 East Hammer Lane, Stockton, Cahfornia <br /> COUNTY San Joaquin <br /> ULTRAMAR CONTACT Joseph A Aldridge TEL NO 559-583-3231 <br /> BACKGROUND <br /> In June 1996, the underground storage tanks were removed and replaced with double-wall <br /> tank systems Soil samples collected from beneath the former tank locations contained <br /> petroleum hydrocarbons <br /> Five groundwater monitoring wells, one air-sparge well, and eight vapor extraction wells were <br /> installed in 1996 and 1997 The monitoring wells have been sampled quarterly since October <br /> 1997 <br /> A Work Plan for further groundwater assessment was submitted in April 1999 <br /> SUMMARY OF THIS UARTER'S ACTIVITIES <br /> Doulos Environmental conducted groundwater monitoring on August 31, 1999 <br /> Groundwater samples were collected from the five existing monitoring wells, one air-sparge <br /> well, and three vapor extraction wells <br /> RESULT OF QUARTERLY MONITORING <br /> Benzene and MTBE were detected in groundwater samples collected from the UST area and <br /> the off-site monitoring well west of the USTs <br /> PROPOSED ACTIVITY FOR NEXT QUARTER ESTIMATED COMPLETION DATE <br /> Perform quarterly groundwater monitoring October 1999 <br /> Conduct further soil and groundwater assessment October 1999 <br /> A Member of 1he Ultramar Group of Companies #1 Quality and Service <br /> Uiltrartt�r <br />
The URL can be used to link to this page
Your browser does not support the video tag.