My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002057
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 12:01:40 PM
Creation date
1/30/2020 10:54:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002057
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOULOS ENVIRONMENTAL COMPANY SAMPLING INFORMATION SHEET <br /> F Client: Ultramar Diamond Shamrock Sampling Date: <br /> Site: Beacon #641 _ Project No. : M98-641-01 <br /> 1210 East Hammer Lane Well Designation: MW-16 <br /> Stockton. CA <br /> Is setup of traffic control devices required? YES time: hours <br /> Is there standing water in well box? Qqq YES Above TOC Below TOC <br /> Is top of casing cut level? fM <GDIf no, see remarks <br /> Is well cap sealed and locked? NO <0E If no, see remarks <br /> Height of well casing riser (in inches) : /A <br /> Well cover type: 8" UV 12" UV 12" EMCO 8" BK <br /> 12" BK 12" DWP 1" CNI�_ 36" CNI Qther <br /> General condition of wellhead assembly: Excellent Goo Fair Poor <br /> Purging Equipment: 2" disposable bailer Submersible pump <br /> 2" PVC bailer Dedicated bailer <br /> 4" PVC bailer Centrifugal pump <br /> Sampled with: Disposable bailer: -Y Teflon bailer: <br /> Well Diameter: 2" 1-Y 4" 6" 8" <br /> Purge Vol. Multiplier: 0. 16 0. 65 1.47 2 . 61 gal/ft. <br /> Initial Measurement Recharge Measurement <br /> Time: r � Time: 4 ,6r _ Calculated purge: <br /> Depth of well: 71 7� Depth to water: 4 2-6 Actual purge: /9.G <br /> Depth to water: L U <br /> Start purge: L5 ro Sampling time: <br /> Time Temp. E.C. pH Turbidity Volume <br /> -� f <br /> L5 F a X_ r,,2 2 <br /> 301 <br /> Sample appearance: �„� .._ Lock: �f <br /> Equipment replaced: (Check all that apply) Note condition of replaced item <br /> 2" Locking Cap: Lock x`3753 : 7/32 Allenhead: <br /> 4" Locking Cap: Lock-Dolphin: 9/16 Bolt: <br /> 6" Locking Cap: Pinned Allenhead (DWP) : <br /> Remarks: <br /> Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.