Laserfiche WebLink
Beacon Station No 641 December 8, 1997 <br /> .Stockton, IifQrnia m nal Subsurface v Qat RepW <br /> well, also the total drilled depth of each boring, was approximately 75 feet bsg Blank PVC <br /> well casing was installed from the top of the screened interval at approximately 50 feet bsg <br /> to the surface The annular space opposite the well screen was backfilled with # 3 Monterey <br /> sand to approximately two feet above each screened interval An approximate three-foot <br />' seal of bentonite was placed above the filter sand and hydrated with approximately ten <br /> gallons of fresh water Additional fresh water was added at the direction of the SJC <br />' PHS/EHD inspector A neat cement/bentonite grout was used to complete the annular seal <br /> to the surface The grout was pumped through grout hoses/tremmie pipes placed in each <br /> boring immediately above the bentonite seal and withdrawn with the rising grout level in <br /> one continuous operation The top of the well casing was secured with a locking water-tight <br />' expansion cap and a steel, water-tight, traffic box set slightly above grade with a concrete <br />' apron The construction details are shown on the corresponding boring logs in Appendix C <br /> Soil Vapor Extraction Well Installation - Phase, <br /> VW-1, VW-2 VW-3, and VW-4 are each 2-inch ID, schedule 40 PVC soil vapor wells <br /> constructed in 10-inch diameter soil borings Wells VW-1 and VW-2 were installed with <br /> monitoring well MW-1, as a triple completion, in the 10-inch diameter soil boring B-2 <br /> Wells VW-3 and VW-4 were installed as a dual completion in the 10-inch diameter soil <br /> boring B-1 The screened intervals are VW-1 = 44 to 54 feet bsg, VW-2 = 21 to 36 feet <br /> bsg, VW-3 = 45 to 55 feet bsg, and VW-4 = 25 to 40 feet bsg Blank PVC well casing was <br /> installed from the top of each screened interval to the surface The annular space opposite <br /> teach well screen was backfilled with # 3 Monterey sand, and a seal of bentonite was placed <br /> in the intervals between the top of the filter sand and the bottom of the screened interval of <br /> the next nested well Bentonite seals varied from 3 to 7-feet thick, as indicated on the boring <br /> logs A neat cement/bentonite grout was used to complete the annular seal from the top of <br />' the uppermost seal to approximately one foot bsg A PVC cap was placed on the top of each <br /> vapor well until the wells are plumbed into a soil vapor extraction system The top of each <br /> well cluster was sealed within a 24-inch diameter, water-tight, steel traffic-rated box <br /> previously installed over 18-inch PVC conductor casings The construction details are <br /> shown on the corresponding boring logs in Appendix C <br />' 1641-13 rpt 6 HORIZON ENVIRONMENTAL INC <br />