Laserfiche WebLink
t <br /> ti g, <br /> .a, <br /> t� <br /> F <br /> V <br /> I <br /> A <br /> , <br /> E PAID NO CA D083003699 <br /> P C NO T 111,424 <br /> SEMI-END DUMPS <br /> BOTTOM DUMPS .� <br /> TRANSFER DUMPS RUCKING INC. 6075 <br /> LOADERS <br /> 6315 SNOW ROAD (805) 399-0246 <br /> BAKERSFIELD, CALIFORNIA 93308 , <br /> CUSTOMER <br /> SHIPPER 3 \ 1 DATE <br /> . ADDRESS TRUCK CAP AXLE TRUCK <br /> MATERIAL POINT OF ORIGIN (s POINT OF DESTI ATION <br /> LOAiIVyE1GHT ARRIVE PLANT DEPART PLANT ARRIVE DU P <br /> # <br /> TAG DEPART DUMP <br /> COMMODITY <br /> r <br /> 1 <br /> TOTAL TONS RATE MRS TON❑ TOTAL r <br /> CHARGES <br /> STARTING TIME ARRIVED TO FINISHED DUMP ALLOWANCE FOR ENDING DEDUCTIONS NET TIME <br /> TIME DUMP LAST LOAD LAST LOAD COMPLETION LAST LOAD TIME <br /> CHECK OFF HWY ON HWY F—] POWER F_] BUNKER <br /> I AGREE TO COURT COSTS ATTORNEYS FEES AND ALL COSTS THAT ARISE FROM ANY PRO DRIVER RECEIVED BY <br /> CEEDINGS FOR THE COLLECTION OF AMOUNTS DUE TO THE ABOVE CARRIER FOR WORK DONE <br /> b FOR THE ABOVE SHIPPERS WILL BE PAID BY THE ABOVE SHIPPERS NOTE P U C requires payment <br /> for these charges not later than 151h of following month —These charges include{1)fees to pay far TERMS All accounts due and payable 15th of month following purchase Past due atter 30 days A <br /> regulation of lransponallor companies by the California Public Utilities Commission and(2)loxes paid to <br /> rot r m o rA,nc inc,n,A r,_ Ge h �Ok— service charge of 111,%PER MONTH which is an ANNUAL PERCENTAGE RATE OF 18%—will be <br /> i,,,,. ,,,,,,,6— —IA <br />