My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002059
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 12:09:39 PM
Creation date
1/30/2020 10:56:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002059
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SITE HEALTH & SAFETY PLAN <br /> 1. 0 INTRODUCTION <br /> A. OVERVIEW <br /> This Project Health & Safety Plan delineates the basic <br /> safety requirements for this project. <br /> This project includes the scope of work for removal <br /> and/or installation as described on the cover sheet of <br /> this Project Health & Safety Plan. During the tank <br /> removal project, soils from beneath the tanks will be <br /> sampled for possible contamination. The soil samples <br /> will be collected and analyzed for the possible presence <br /> of migrating contaminants, including: TFHC (Total Fuel <br /> Hydrocarbons) and BTX Compounds (Benzene, Toluene, and <br /> Xylenes) . <br /> At the beginning of the project, ambient air samples <br /> (background) will be taken with a Gastech LEL meter, set <br />• for reading ppm range, to determine the presence or <br /> absence of contamination. As the project continues <br /> during the day, the personnel on site shall draw <br /> periodic air samples to determine the possibility of <br /> increases in airborne contamination. <br /> The provisions set forth in this plan will apply as <br /> minimum rules to be followed by the employees of Walton <br /> Engineering, Inc. , the Environmental Consultant Company <br /> (lasted on the cover sheet of this Project Health & <br /> Safety Plan, and herein referred to as "Environmental <br /> Consultant") and their subcontractors working on this <br /> phase of the project. The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase <br /> the safety requirements, and only with the concurrence <br /> of Walton Engineering, Inc. . <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.