Laserfiche WebLink
n � <br /> -t MW-1 B , 4513 <br /> t 3q 04 ;b SCv ©1D sla su- I ,a0 S h� e <br /> QI� �0 <br /> Proposed Well Name Near 9/99 CPT# Proposed Screened Interval Casing diameter Soil Sampling Continuous Core <br /> gFM-� SewQ sena 0.c s,rn ?uC <br /> MW-1A 101,5--LL1 CPT-05 24 -33' `S6X26-33' ` 2" none 23-28' , �� °orctisssfa �T <br /> Fess wig R%�T 2G•S ,� Hele C'•'`r'Z"oAkF) <br /> MW-1 _ - CPT-05 y 1 - 3' 63-73' 2" eve 5'from 5-55' 58-63' <br /> IM-V -' 16 - 19 CPT-04 1 -21,$' 24.27 2 - 4" none 19-24' <br /> MW-28 53' - s6' CPT-06 SE' -}1' 61-71' 58' -}1' 4" every 5'from 5-50' 56-61' <br /> MW-3A p16 - 15' CPT-01 19' - zd,�-' 21-31'-*'- 4" none 16-21' <br /> MW-3B b �¢ CPT-01 6q - g ' 68-78' 66 $� 4" every 5'from 5-60' 63-68' <br /> MW-4A 16' -lit CPT-03 IQt - 21 Ii 22-2T ZI'-ZSt 4" none 17-22' JPS d3I J" <br /> MW-4B 2' S CPT-03 1,5 1 �$L 76-81' -44'42V 4" every 5'from 5-60' 66-76' <br /> MW-5A 3-' - 6 CPT-02 ZO - 7-1,5' 24-29' ?'- 2T ✓ 4" none 19-24' <br /> MW-5B L� -(�q' CPT-02 (oto' - g l' 71-81' 4" every 5'from 5-60' 66-71' / <br /> - Groundwater is interpreted to exist in isolated lenses under confineticonditions with a potentiometric surface of about 26'bgs. (See CPT logs) <br /> -Soils between the water-bearing lenses may or may not be saturated. <br /> -The groundwater is expected to be contaminated,while the unsaturated soils are expected tabe clean. <br /> -Continuous coring is proposed in an effort to identify contaminated or saturated soils above the water-bearing zone being screened. Screened intervals are <br /> subject to change (in 1-foot increments)depending upon the findings of the continuous coring. Continuous coring will be aborted (after 2 or 3 borings)should <br /> the findings not provide any valuable data- <br /> - Please provide: <br /> estimated volume of soil cuttings <br /> cost estimate for development of the monitoring wells <br /> drums for soil and water containment <br /> estimated duration for the field effort <br /> steam cleaning of equipment between boreholes \v <br /> brass sleeves, plastic caps, and teflon for soil sampling <br /> -Assume that we have a water supply at the site and a forklift. <br /> -Keep in mind that we will want to try to segregate(if possible)the dry (clean)and saturated (dirty)soil cuttings during drilling. - <br /> -We are counting on your experiences at Sharpe Army Depot to help in this field effort. Subsurface conditions should be very similar. <br /> -See the attached proposed monitoring well schematic for construction details. Do your experiences warrant any changes? <br /> -Can you provide a separate line item for the continuous coring. It is possible we may still scratch this item prior to going into the field. a 6 <br /> a <br />