ACTIVITY-ALTERNATIVE A 2 _ ___ Range-Low Range-High <br /> PLANNING AND PREPARATION <br /> Stormwater Permit N/A N/A <br /> Surveying N/A N/A <br /> Workplan $3,500.00 $5,000 <br /> INSTALL DEWATERINGrTREATMENT SYSTEM <br /> Discharge fee $3,000.00 $3,500.00 <br /> System design $1,000.00 $2,000.00 <br /> USA-utility locates 5300.00 $500.00 <br /> Install piping,instrumentation(flow meter,LEL meter) $7,000.00 59,000.00 <br /> Dewatering pumps/transfer pumps(set power) $5,000,00 $6,000.00 <br /> Holding tanks $1,500.00 $3,000.00 <br /> Carbon system(based on a 1-month rental fee) $3,500.00 55,000.00 <br /> Lab analysis for discharge $2,500.00 $3„500.00 <br /> System demob/spent carbon recycling $3,000.00 $5,000.00 <br /> EXCAVATION AND BACKF LLING <br /> Stormwater controls $1,000.00 $2,000.00 <br /> Design shoring Included Below <br /> Remove/dispose concrete slab $1,000.00 $2,000.00 <br /> Destruction of monitoring well $2,000.00 $3,000.00 <br /> Remove power line and power pole $2,000.00 $2,500.00 <br /> Soil waste profile $2,000.00 $2,500.00 <br /> Excavation of soil/backfilling/transportation of impacted soil $69,946,15 $75,497.44 <br /> Addition of Calcium Peroxide(1,000 pounds) $3,400.00 $3,400.00 <br /> Disposal of impacted soil $22,205.13 $26,646.15 <br /> Soil sampling/analysis $5,500.00 $8,000.00 <br /> Project oversight $7,000.00 $9,000.00 <br /> Compaction testing $2,500.00 $3,500.00 <br /> Replace power pole $2,000.00 $2,500.00 <br /> ShGAHOWWFing plaemm $45,000. $50,4W. <br /> TOTAL BUDGET COST ESTIMATE <br /> $150,851.28 $183,043.59 <br /> ALTERNATIVE A 2(With dewatering and no shoring) <br /> R:ICONTGRAN1StocktonlCAPICap Addendum Costs&Supporting Caics <br />