Laserfiche WebLink
p <br /> ACTIVITY-ALTERNATIVE A 3 ~—_- -_--- Range-Low Range-High <br /> PLANNING AND PREPARATION <br /> Stormwater Permit NIA NIA <br /> Surveying NIA N/A <br /> Workplan $3,500.00 $5,000 <br /> INSTALL DEWATERINGPTREATMENT SYSTEM <br /> Discharge fee $3,000.00 $3,500.00 <br /> System design $1,000.00 $2,000.00 <br /> USA-utility locates $300.00 $500.00 <br /> Install piping,instrumentation(flow meter,LEL meter) $7,000.00 $9,000.00 <br /> Dewatering pumpsifransfer pumps(set power) $5,000,00 $6,000.00 <br /> Holding tanks $1,500.00 $3,000.00 <br /> Carbon system(based on a 1-month rental fee) $3,500.00 $5,000.00 <br /> Lab analysis for discharge $2,500.00 $3,500.00 <br /> System demob/spent carbon recycling $3,000.00 $5,000.00 <br /> EXCAVATION AND BACKFILLING <br /> Stormwater controls $1,000.00 $2,000.00 <br /> Design shoring Included Below <br /> Remove/dispose concrete slab 51,000.00 $2,000.00 <br /> Destruction of monitoring well $2,000.00 $3,000.00 <br /> Remove power line and power pole $2,000.00 $2,500.00 <br /> Soil waste profile $2,000.00 $2,500.00 <br /> Excavation of soil/backfilling/transportation of impacted soil $110,000.00 $120,000.00 <br /> Disposal of impacted soil $26,000.00 $30,000.00 <br /> Soil samplinglanalysis $5,500.00 $8,000.00 <br /> Project oversight $7,000.00 59,000.00 <br /> Compaction testing $2,500.00 $3,500.00 <br /> Replace power pole $2,000.00 $2,500.00 <br /> Shoring/shoring placement $85,000.00 $95,000.00 <br /> TOTAL BUDGET COST ESTIMATE $276,300.00 $322,500.00 <br /> ALTERNATIVE A 3: <br /> R:ICONTGRAN1StocktonlCAPlCap Addendum Costs&Supporting Calcs <br />