My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 1:10:56 PM
Creation date
1/30/2020 11:32:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Jeff Wong [EH] <br /> 1 <br /> From; Linda Huff[Ihuff@huffnhuff.com] <br /> Sent: Friday, August 26, 2005 11:48 AM <br /> To: Jeff Wong [EH] <br /> Cc: dan.decker@conti.com; Robert Marty; Jeremy Reynolds <br /> Subject: Stockton schedule <br /> Jeff, <br /> I left you an voice mail message today but wanted to confirm my message to you. We have been working to assure that all <br /> subcontractors and permits are in order for the planned excavation. Today we learned that we need security and some additional <br /> insurance to satisfy Penny Newman. We are also working on insurance and contract issues with the shoring contractor. The <br /> shoring contractor also needs to give us stamped engineering drawings for the shoring. All of this work is taking a little longer than j <br /> we thought so it looks like we will need one extra week to be sure all is in order before we start. <br /> We do have the landfill established and the permit to discharge to the City of Stockton. The dewatering equipment is set as is the <br /> excavator and the trucking firm. We are confident that work will be started at the end of next week or after Labor Day depending <br /> upon the availability of the excavator to dig a trench for the shoring contractor. Right now the shoring contractor will need 4 to 5 <br /> days to complete their work, and then the excavation will begin. <br /> We are doing our best to meet the schedule but some of these unexpected items are taking time: I wanted to keep you apprised <br /> of our progress. Also, Dan and I would like to talk early next week with you. Is there a good time for that? Please let me know. <br /> Linda <br /> Linda L. Huff, P.E. <br /> President <br /> Huff& Huff, Inc. <br /> L 1 ff[hUff11huff.Co1)_1 <br /> Phone: (708)579-5976 <br /> Fax: {708}579-3526 <br /> 8/26/2005 <br /> M <br />
The URL can be used to link to this page
Your browser does not support the video tag.