Page 1 of 1 <br /> Jeff Wong [EH] <br /> 1 <br /> From; Linda Huff[Ihuff@huffnhuff.com] <br /> Sent: Friday, August 26, 2005 11:48 AM <br /> To: Jeff Wong [EH] <br /> Cc: dan.decker@conti.com; Robert Marty; Jeremy Reynolds <br /> Subject: Stockton schedule <br /> Jeff, <br /> I left you an voice mail message today but wanted to confirm my message to you. We have been working to assure that all <br /> subcontractors and permits are in order for the planned excavation. Today we learned that we need security and some additional <br /> insurance to satisfy Penny Newman. We are also working on insurance and contract issues with the shoring contractor. The <br /> shoring contractor also needs to give us stamped engineering drawings for the shoring. All of this work is taking a little longer than j <br /> we thought so it looks like we will need one extra week to be sure all is in order before we start. <br /> We do have the landfill established and the permit to discharge to the City of Stockton. The dewatering equipment is set as is the <br /> excavator and the trucking firm. We are confident that work will be started at the end of next week or after Labor Day depending <br /> upon the availability of the excavator to dig a trench for the shoring contractor. Right now the shoring contractor will need 4 to 5 <br /> days to complete their work, and then the excavation will begin. <br /> We are doing our best to meet the schedule but some of these unexpected items are taking time: I wanted to keep you apprised <br /> of our progress. Also, Dan and I would like to talk early next week with you. Is there a good time for that? Please let me know. <br /> Linda <br /> Linda L. Huff, P.E. <br /> President <br /> Huff& Huff, Inc. <br /> L 1 ff[hUff11huff.Co1)_1 <br /> Phone: (708)579-5976 <br /> Fax: {708}579-3526 <br /> 8/26/2005 <br /> M <br />