My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:05:17 PM
Creation date
1/30/2020 11:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A S S O C I A T E S I N C . <br /> 4 <br /> three to five well.volumes, a sample will be collected when the water level is sufficient to <br /> provide a representative sample (i.e.,return to 80% or more of static water level). Water samples <br /> will be collected using disposable bailers, one dedicated to each well. <br /> The groundwater samples will be immediately placed in a cooler with ice and delivered under <br /> -certified analytical laboratory. Samples will be <br /> chain-of-custody documentation to a State <br /> analyzed for TPHg and TPHd by EPA Method 8015 modified, and BTEX and MTBE by EPA <br /> Method 8020. If MTBE is detected by EPA Method 8020, the sample will be analyzed for i <br /> oxygenate fuel additives by EPA Method 8260.. Purge water will be stored on site in 55-gallon <br /> drums approved for hazardous liquid storage pending laboratory analysis. <br /> Report Preparation <br /> Upon completion of all field activities, a summary report will be prepared for submittal to <br /> PHS/EHD. ATC will prepare a report that will include a description of all field activities, <br /> laboratory analytical results, well construction logs, and recommendations. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. A completed Site Safety Plan and Quality Control/Quality <br /> Assurance Plan are already on file with PHS/EHD for this site. All field work will be completed <br /> in accordance with these plans. <br /> PROJECT SCHEDULE <br /> f The off-site groundwater monitoring wells will be installed on May 24 and 25, 2000, pending <br /> PHS/EHD approval of this workplan addendum. <br /> t <br /> i <br /> i w:1625001reportslwkpiiiadd.doc <br /> 4 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.