My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
550
>
3500 - Local Oversight Program
>
PR0545261
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:28:37 PM
Creation date
1/30/2020 11:37:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545261
PE
3528
FACILITY_ID
FA0009791
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #9
STREET_NUMBER
550
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13921007
CURRENT_STATUS
02
SITE_LOCATION
550 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glortonini <br /> Page 2 <br /> 1740 Houston Avenue <br /> A revised work plan and permit application will be submitted next week. <br /> Fire Stations <br /> Work plans dazed May 29, 1996 were submitted to PHS/EHD on July 17, I996. PHS/EHD stated that <br /> review of the plans was not completed, but that permit applications should be submitted. PHS/EHD <br /> indicated that some of the sites would not require the scope of investigation which were proposed and i <br /> that PHS/EHD would prepare specific comments for each site and include any comments with drilling ; <br /> permits. <br /> 134 Sutter <br /> PHS/EHD stated that one soil boring, sampled appropriately, should provide sufficient information to <br /> evaluate the residual soil contamination which was observed by the PHS/EHD inspector on site at the } <br /> time of the limited over-excavation. it was discussed that a slant boring or probing could be done r <br /> instead of drilling in the Parking District's office. PHS/EHD further indicated that if a permit k <br /> application and revised work plan was submitted the work could be scheduled in conjunction with the f <br /> work associated with the COS Fire Stations. <br /> The next meeting is scheduled for Tuesday, February 4, 1997 at 1:30 p.m_ and will be held at the PHS/EHD } <br /> office. <br /> Should you have any questions or disagree with this summary, please contact either Margaret Lagorio at (209) <br /> 468-3449 or Mary Meays at (209) 468-0337. <br /> Dolma Heran, REHS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior REHS Margaret gorio, REHS <br /> Site Mitigation Unit Supervisor <br /> i <br /> MMICOS <br /> cc: Elizabeth Thayer, CVRWQCB <br /> cc: Jim Escobar, COS Public Works <br /> cc: Bob Murdoch, COS Public Works <br /> I <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.