My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
550
>
3500 - Local Oversight Program
>
PR0545261
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:28:37 PM
Creation date
1/30/2020 11:37:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545261
PE
3528
FACILITY_ID
FA0009791
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #9
STREET_NUMBER
550
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13921007
CURRENT_STATUS
02
SITE_LOCATION
550 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` v ; <br /> Case Closure Summary Page 2 <br /> Leaking Underground Fuel Storage Tank Program <br /> !II Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH (Gas) Ethylbenene .01 <.0005 <br /> TPH (Diesel) 310 .410 Xylene .07 <.0005 <br /> Benzene <.005 <.0005 TCE <br /> Toluene .01 .0007 PCE <br /> MTBE 1<.025 1 1<.005 <br /> Comments: No remediation was performed at this site. The Soil Before Results for TPH-d is from SP1 at 12 feet below <br /> surface, BTEX and MTBE from SP2 at 16 feet below surface. The Groundwater Before Results are from a grab water <br /> sample from SPI which was through the UST location. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> Site management requirements: None <br /> Should corrective action be reviewed if land use changes? No <br /> MonitoringNapor wells decommissioned: Number Decommissioned: Number retained: <br /> List enforcement actions taken: NOR <br /> List enforcement actions rescinded: <br /> V. Local Agency Representative Data <br /> Name: Donna Heran Title: Director of Environmental Health <br /> Signature: Date: 7 3 <br /> VI. Centra! Valley Regional Water Quality Control Board (RB) Notification <br /> Date Submitted to RB: 05/27/98 Response Date: 07/06/98 <br /> RB Staff: Mark List Response: Concurrence <br /> Title: Engineering Geologist <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER, Shall be retained by the lead agency as part of the official � <br /> site file. <� <br />
The URL can be used to link to this page
Your browser does not support the video tag.