My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
117
>
3500 - Local Oversight Program
>
PR0545260
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:52:52 PM
Creation date
1/30/2020 11:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545260
PE
3528
FACILITY_ID
FA0005325
FACILITY_NAME
INLAND PAINT COMPANY
STREET_NUMBER
117
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707031
CURRENT_STATUS
02
SITE_LOCATION
117 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> A S S O C I A T E S I H 'C . <br /> Task 5: Report Preparation' <br /> ATC will prepare a report that will include a description of all field activities, laboratory analytical <br /> results, boring logs, and recommendations. A draft report will be submitted to the client for <br /> review and any comments will be 'incorporated into the final report prior to submittal to the <br /> PHS/EHD. <br /> All work described in this proposal will be performed under the direction of a California <br /> Registered Professional Engineer. <br /> ESTIMATED BUDGET <br /> Our total estimated budget for the proposed activities is $16,163. An estimated budget which <br /> summarizes the cost for the proposed work is contained in Attachment 1. If it is determined in <br /> the field by ATC and-PHS/EHD personnel that the deep nested well is necessary, a change order <br /> for the Contingency Costs amount shown in Attachment 1 will be issued. Any additional work <br /> performed that is not described in this proposal or estimated budget will be treated as a separate <br /> phase of work and may require a separate proposal and estimated budget. If this proposal and <br /> cost estimate are acceptable to you, please sign the change order contained in Attachment 2 and <br /> return to our office. <br /> } <br /> If you have any questions regarding this proposal or need additional information please call our <br /> office at (209) 579-2221. <br /> I <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> 8,tivv <br /> Drew Van Allen <br /> Staff Scientist <br /> Jeanne Homsey, P.E. <br /> California Registered Civil Engineer.C47410 <br /> Attachments <br /> w:\proposahp910001p91015b.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.