Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> .................. <br /> q PROJEC..T.'::.INFORMAT.ION:::.:" . <br /> • PROJECT NAME: LVvUx.� PROJECT NUMBER: -tel WELL NO. <br /> PROJECT MANAGER: Q TYPE OF WELL: ✓ Monitoring _Extraction Other <br /> RECORDED BY:. SAMPLED BY: DATE: <br /> LL-:L:PURGING�.-7..INFORMATION:::' <br /> ................... .. ...... <br /> PURGE VOLUME PURGE METHOD <br /> Well p6sing Diameter <br /> _flinch —Other4.tA-- <br /> —n✓Bailer - Type <br /> —Pump Type <br /> Well Total Depth AA 16&4 U feet below Top of Casing,TO —Other Specify <br /> Depth to Water feet below Top of Casing,WL Hydrocarbon Odors: <br /> Water Column Length feet Yes ioo✓No <br /> Purge Volume calculation (Water Column Length x Multiplier x No.Volumes = Calculated Purge Volume) <br /> [�'L-Lt. 0 —t"+- -5 <br /> X X Calculated Purge Volume = 0.3 gallons <br /> (WCL) (Multiplier) (No.Volumes) Actual Purge Volume gallons <br /> MtJ<Elolier:: Casa E3iametec< cher Gallonsfllneai.foot 2=':fl.i 7 :=::4 D 66:'r: B 1:5? 8.:-:26 <br /> .. ............ <br /> Groundwater Parameter Measurement Meter Type"bi 3503 Calibrated, —"Yes No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEMP TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (ft) inhos/cm deg C mV <br /> d2q F — <br /> -2 <br /> 1pery L(.C' -yqk 3q 2k,4 7 -Lw— <br /> lo v-A Z'k' ZA30 <br /> IoZ3 g.A. 7;00 <br /> LE <br /> 'WWASSOCIATES INC. <br /> F1WR0NAtWrAL,GEOTECHNICAL Mo m4TEMLS PROPES <br />