Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT.jNFORMATION <br /> PROJECT NAME-ImNolyd PROJECT NUMBER: 172q&,o c�ic)i WELL NO. " <br /> PROJECT MANAGER: 1w f'+ TYPE OF WELL: ✓ Monitoring Extraction Other <br /> j RECORDED BY: AF SAMPLED BY: DATE: O!e QW 9 �} � <br /> :' °` .. . <`IVELL: PE7RGWG.;':INFORiVIAT1ON:: <br /> PURGE VOLUME PURGE METHOD <br /> We�Y Casing Diameter <br /> 2-inch flinch Other ✓Bailer - Type ���(ar•. <br /> Well Taal Depth �t 5� feet below Top of Casing,TO Pump - Type <br /> Other - Specify <br /> Depth to Water Z3�7 If feet below Top of Casing,WL Hydrocarbon:Odcrs: <br /> �y op Yes v0' No <br /> Water Column Length [+O� feet <br /> Purge Volume Calculation (Water Column length x Multiplier x No.Vccllumes Calculated Purge Vol <br /> 1Z,94 X D, X '3 _ 7 i Calculated Purge Volume gallons <br /> (WCL) (Multiplier) (ND.Volumes) Actual Purge Volume = �ailons <br /> Mttlolier Casi :Diameter hche;� = GsilonslGnear>fdot. 2:W a,1T .';:4 a66.i?6 1:5; `8:=>28 . <br /> Groundwater Parameter Measurement: Meter TypemSl alibral.Yes_No <br /> TIME ELAPSED FLOWRATE DTW pK, EC *ec <br /> TURBIDITY REDOX COMMENTS <br /> 71ME (GPl1A) (ft) s;_' -anhoslcm (NTU) mV <br /> t <br /> Q 9�l 1 1 '1 h -orQ--A'�O M-f^v <br /> 09 0. zb <br /> n 17-93 ^. <br /> 9 <br /> �1 MOCIATES INC. <br /> ENl?RONMFNTAL,GEOTECHNICAL AND MAT'EMALS ARCMSSrONALS <br />