My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:33:14 PM
Creation date
1/30/2020 1:23:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case Closure Summary Page 2 <br /> Leaking Underground Fuel Storage Tank Program <br /> III Release and Site Characterization Information continued <br /> Maximum Documented Contaminant Concentrations--Before and After Cleanup <br /> Contaminant Soil (ppm) T65 <br /> Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After <br /> TPH (Gas) 5900 0.67 Xylene 1000 0.068 0.330 ,0.0005 <br /> TPH(Diesel) 15000 <10.0 Ethylbenzene 190 <0.005 0.036 <0.0005 <br /> Benzene 70 0.042 Oil&Grease NA NA NA <br /> Toluene 630 0.017 5 Heavy Metals NA NA NA NA <br /> MTBE NiA NA NA ,0.0005 <br /> Comments: Soil Before result are from samples (T3A, P4)that were collected at the time of the UST and piping removal. <br /> Soil After results arefrom MW#2 at 19 feet below grade. Water Before results are from MW2 on 5/11/95. Water After <br /> results are from MW2 on 10/29/04. 700 cubic yards of soil was removed from the area of P4 (dispenser area)and was <br /> remediated on-site. No other remediation occurred at this site. Groundwater monitoring was conducted from 1993-2005. <br /> GROUNDWATER RESULTS ARE FROM MW#2 WHICH HAD THE HIGHEST CONTAMINANT CONCENTATIONS <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?YES <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? YES <br /> Does corrective action protect public health for current land use?YES <br /> Site management requirements: NA <br /> Should corrective action be reviewed if land use changes? NA <br /> Monitoring/Vapor wells: 8 Number Decommissioned: 8 Number retained: 0 <br /> List enforcement actions taken: NOR SENT TO RP <br /> List enforcement actions rescinded: NA <br /> V. Local Agency Representative Data <br /> ame: Donna HeS Title: Director, Environ ental Health Department <br /> Signature: Date: <br /> VI. ntfal Valley Regional Water Quality Control Board (RB) Notification <br /> Date Submitted to RB: 3/13/06 Response Date: 5/8/06 <br /> RB Staff: Brian Newman Response: No Further Action Required Concurrence <br /> Title: Underground Tank Program Manager <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER,Shall be retained by the lead agency as part of the official <br /> site file. <br />
The URL can be used to link to this page
Your browser does not support the video tag.