My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:28:51 PM
Creation date
1/30/2020 1:24:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uaizaiaa 1Uh z1:Us YAA 2U9 94621 KLEINFELDER INC A PES/EHD 10002 <br /> I i <br /> r. <br /> ItKLEINFELDER 1' <br /> An employee owned rampant y! <br /> 1 <br /> File No.20-1108-24.E01 <br /> I <br /> S:,ptember 27, 1999 EE' <br /> I <br /> Mr.Harlan Noll <br /> C ounty of San Joaquin <br /> P ublic Health Services Department <br /> E avironmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,California 95202 <br /> Subject: Proposal <br /> Abandonment in Place <br /> Underground Storage Tanks(USTs) , <br /> Granite Construction Facility <br /> 10500 South Harlan Road <br /> French Camp,California <br /> I tear Mr. Noll: <br /> !,t the request of Mr. Hop Essick of Granite Construction Company, we are providing you with <br /> t lis proposal for the abandonment in place of two underground storage tanks (USTs) from the f <br /> bove-referenced project site. Following your approval of the proposed methodology, Granite <br /> Construction Company will begin implementation of this plan as follows. <br /> L <br /> ]BACKGROUND <br /> '.'he site is located at 10500 South Harlan Road which runs parallel and just east of Interstate 5 in <br /> french Camp, California. The subject site is currently an operating construction yard utilized by <br /> t 7ranite Construction Company. The site consists of an office, shop area, fuel storage areas, <br /> latch plant, scales, silos, parking areas, etc., for construction purposes. The surrounding areas <br /> tire primarily light industrial and rural residential housing. Interstate 5 is located just west of the <br /> :,ite. The location of the two existing USTs discussed in this report are situated in a tank cluster <br /> (if seven tanks located south of a batch plant area at.the Granite Construction yard. The area <br /> 1 liscussed within this document includes a tank cluster area located towards the eastern portion of <br /> I he site within a yard area south of a batch plant. The,tank cluster is immediately overlain with <br /> ocincrete. The majority of the yard area,however is covered with gravel <br /> 1 <br /> i <br /> :0-1108-42.E01/20191,653 Page I of 4 <br /> :opyright 1999,Kleinfelder,Inc. September 27,1999 <br /> KLEINI ELDER 2825 East Myrtie Street,Stockton,CA 95205-4794 (209)948-1345 (209)948-0621 fax 1 <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.