My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002575
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:36:34 PM
Creation date
1/30/2020 1:30:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002575
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> WALLACE - KUHL <br /> &ASSOCIATES INC <br /> October 20, 1994 �; , Q C T 7 P,"I 1 t}5 <br /> Mr Hop Essick <br /> P O Box 151 <br /> Stockton, California 95201 <br /> QUARTERLY STATUS REPORT <br /> GRANITE CONSTRUCTION FACILITY <br /> 10500 South Harlan Road <br /> French Camp, California 95231 <br /> WKA No 2088 05 <br /> Dear Mr Essick, <br /> As required by the San Joaquin County Public Health Services, we are submitting <br /> this quarterly status report for the subject property located a 10500 South Harlan <br /> w <br /> Road in French Camp, California (Plate 1) <br /> The most recent ground water elevation measurements of the six monitoring wells <br /> r Geotechnical Engineering (MW1 through MW6) were obtained on October 7, 1994, historic ground water <br /> Engineering Geology elevation data is provided in Table 1 Based on current ground water elevation <br /> measurements, the ground water flow direction beneath the subject property is <br /> I rd Environmental Consulting northwesterly with a hydraulic gradient of 0 0035 feet/foot (PIate 2) <br /> \ Remediation Services <br /> Ground water samples were also obtained from the six on-site monitoring wells on <br /> Construction Inspection <br /> October 7, 1994 Prior to sampling, each well was checked for visual signs of free <br /> Materials Testing product using a clear bailer Approximately three to five well volumes of water were <br /> purged from each well using a two-inch submersible pump until temperature, pH, <br /> f <br /> i and conductivity readings stabilized and/or the water cleared of sediment The water <br /> samples were then collected using a new polyethylene disposable bailer Water from <br /> 3050 Industrial Blvd <br /> the disposable bailer was decanted into appropriate sample containers provided by the <br /> West Sacramento laboratory <br /> CA 95691 <br /> Fax 916 372 2565 <br /> ✓ 916 372 1434 <br /> Recycled pap f 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.