My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002579
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:38:10 PM
Creation date
1/30/2020 1:33:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002579
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a>, as as <br /> SAMPLE DEPTH (feet) <br /> Shed T1A 16 N <br /> TIB 16 <br /> Above-Ground TIC 16 <br /> Diesel Tank T2A 16 <br /> Concrete Pad T2B 16 <br /> T2C 16 <br /> Above-Ground T3A 16 <br /> Diesel Tank T313 16 <br /> T4A 16 SCALE feet <br /> Above-Ground BulkT4B 16 <br /> Above-Ground 44 0 0 0 <br /> Oil Tanks 00 Gasoline Tank <br /> ----- P2 P2 4 <br /> to 0 P3 4 <br /> Dispensers 9TIC T'{B- TIA; P4 6 <br /> "ate M <br /> Former 12,000-Gallon Former 20,000-Gallon T10 <br /> Fuel Pipeline Trench G � <br /> Concrete Drive Diesel Tank Diesel Tank _ sP •p <br /> 00 1 SOW <br /> � T28 T2A4 <br /> � iT2 C <br /> �4 alM�U Former Dispenser Island <br /> D2111 �� tie T3A; <br /> unpaved __SFormer 40,000-Galion <br /> Gasoline Tank KEY <br /> STK 1 • = Approximate stockpile sample location <br /> U. <br /> T1A • = Approximate tank pit sample location <br /> STK 1• C7 � SAB �� 7�A <br /> qQ P1• = Approximate pipeline sample location <br /> *STK 3�j "j0 Soil Stockpile J'rjL Farmer 10,000-Gallon <br /> c' �l� �� Gasoline Tank <br /> Shed Soil Stockpii O NOTE �1 <br /> a 1 Unpaved <br /> ' Site plan drawn from field measurements <br /> Asphalt Drive <br /> I� <br /> WALLACE KUHL &ASSOCIATES DRAWN BYE WGK SITE PLAN PROJECT NO- 2088.01 <br /> INCORPORATED CHECKED BYE N1K GRANITE CONSTRUCTION FACILITY DATE' 4192 <br /> Geotechmcat Consultants I Construction Testing Stockton, California PLATE NO I <br />
The URL can be used to link to this page
Your browser does not support the video tag.