Laserfiche WebLink
h� K L F I N F E L D E R <br /> into the glass ampoule The glass ampoule is then pulled out of the pipe, disengaging the <br /> syringe The septum in the glass ampoule and drive tip reseals after the syringe is removed <br /> rTo reduce the potential for introducing contaminants into the samples, the drive tip, galvanized <br /> pipe, and other equipment used foi sample collection are steam cleaned and/or washed with <br /> trisodium phosphate or non-phosphate detei gent solution and double rinsed with distilled water <br /> prior to use The sample probe and filters are cleaned in TSP solution and rinsed with methyl <br /> alcohol followed by a distilled watei rinse prior to use New, factory-sterilized syringe needles, <br /> 0-rings, septums and sample tubes aie used foi each sample <br /> B-2.6 Sample Handling <br />' After labeling, sample, the is immediately stoied in an iced cooler for transport to Kleinfelder's <br /> p Y <br /> office sample control or to the analytical laboratory A Kleinfelder chain-of-custody form <br /> accompanies the cooler The chain-ot-custody form includes Kleinfelder's name, address and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, the sample inatiia (soil or water) and the analyses for which the samples are <br /> being submitted, if any The chain-ot-custody fonri is signed by each person who handles the <br />' samples, including all Kleinfeldei employees and the receiving employee of office sample <br /> control or the analytical laboratory when the samples are delivered <br /> B-2.7 Decontamination of Equipment <br /> To reduce the potential for cioss-contamination, augeis and associated equipment are steam <br />' cleaned prior to dialling each boinig, In addition, sampling equipment is cleaned with a <br /> trisodium phosphate of non-phosphate deteigent wash and rinsed with distilled water prior to <br /> collecting each soil sample <br /> B-2 8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately atter the collection and logging of soil samples Closure is <br /> accomplished by 01OUting the boi ing with a cement/bentonite sluiry or as otherwise required <br />' Drill cuttings will be placed in 55--allon diums wrapped in plastic or spread around the boring <br /> and left on site foi disposal by the site owner If tequested, Kleinfelder can coordinate disposal <br /> of soil and watci altei analytical results are available <br /> • <br /> 20-1108-24 r-01/20198120 Page B-3 <br /> 01999,KleintL1&r Ing. February 5, 1999 <br />