Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K. Heron, R.E.H.S. Carl Bor man, R.E.H.S. <br /> N: Direcla 304 East Weber Avenue, Third Floor Borg <br /> man, <br /> Huggins, R.E H S , R.D.I. <br /> Al Olsen, R.E.H.S. Stockton , California 95202-2708 Douglas W. Wilson, R.E.H.S . <br /> Rogram Manager Tejephone: (209) 468-3420 Margaret Lagono, R. E. H.S . <br /> 9 <iF 66. Laurie A. Cotulla, R.E.H.S. Robert McClelton, R.E.H.S. <br /> - Program Manager Fax: (209) 464-0138 Mark Barcellos, R.E.H.S. <br /> PAUL SUPPLE JUS! 2 12004 <br /> ARCO PRODUCTS COMPANY <br /> PO BOX 6549 <br /> MORAGA CA 95470 <br /> RE : Former ARCO #548 SITE CODE : 1127 <br /> 1612 Hammer Lane <br /> Stockton CA 95209 <br /> San Joaquin County Environmental Health Department (SJC/EHD) has reviewed the <br /> proposal "Modification of Remediation Activities" dated May 13, 2004 submitted on your <br /> behalf by URS Corporation (URS) and has the following comments . <br /> URS proposes to modify the remedial activities at your site by discontinuing operation of <br /> the soil vapor extraction/air sparge (SVE/AS) system for an unspecified period of time <br /> while evaluating trends in the concentrations of groundwater contamination reported at <br /> quarterly groundwater monitoring and sampling events . URS supports this proposal by <br /> noting decreased system air influent concentrations between November 2003 and <br /> February 2004, and by decreasing trends in reported contaminant concentrations in the <br /> groundwater. <br /> SVE/AS was initiated at this site in September 2000 . At that time , a final corrective <br /> action plan (CAP) had not been submitted . In conversation with your consultant, then <br /> Pinnacle, it was discussed that the system was considered to be an interim remediation <br /> strategy. SJC/EHD verbally informed Pinnacle in this conversation that a feasibility <br /> study comparing at least two clean up alternatives must be completed for this site, <br /> followed by a CAP. <br /> All of the monitoring wells at this site have screen intervals that are completely <br /> submerged , and have been so since approximately 1993. To obtain data on the quality <br /> of the shallow groundwater, the vapor extraction wells that have water in them have <br /> been routinely sampled since December 2001 . However, due to the construction details <br /> of these wells, the groundwater samples collected from them have been grab samples , <br /> and therefore may not be representative of true groundwater conditions, especially <br /> considering that some of these wells are currently being used for remediation. In <br /> SJC/EHD correspondence dated June 18, 1998, you were directed to submit a work <br /> plan that included the installation of additional monitoring wells to monitor and sample <br /> shallowest groundwater, and a proposal to investigate the vertical extent of <br /> contamination in both the soil and groundwater, among other directives . The <br /> August 10, 1998 work plan submitted by Pinnacle did not include proposals to address <br /> these two specific issues . <br />