My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:45:54 PM
Creation date
1/30/2020 1:50:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov - 03 - 97 05 = 11P ARCO 5102998872 PeO2 <br /> h <br /> P Kyle A. Christie <br /> 10!30197 NIS ANI <br /> • � s � s � � er � s es • Mr <br /> To Lynn J. BCQeag/APC/ARCO@ARCO, Kandy Quesada;APCPARGO@ARCO, Paul V. SupplerAPC/ARCO <br /> cc: Kvle A Christie/APC/ARCO <br /> Subject Ar548 SteCkton <br /> , ,III <br /> Facility #548 has been closed for some time. Environmental was going to demo the site once the sale of <br /> the property went through . Paul Supple ncv informs me that the site is involved in litigation and the <br /> property wile is held up. ARCO needs to remove the steel USTs in the very near future. Legally, we had <br /> 90 days after the closing of the facility to remove the USTs but we were able to gel extensions. We [rave <br /> been informed that we can not postpone the UST removal any longer. I have Instructed Paul Supple to <br /> prepare a bid document to remove only the tanks and lines. We will not remove any other <br /> Improvements. <br /> Kandy, please prepare a memo AFC for the removal of the single wail steel LISTS. Removal costs are <br /> estimated At $?800 and environmental charges are estimated at 1175,000. Total estimated AFC cost is <br /> $100,000. Please pet this AFC processed AGA®. Thanks. <br /> Kyle <br />
The URL can be used to link to this page
Your browser does not support the video tag.