My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:30:38 PM
Creation date
1/30/2020 1:51:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br /> Work Plan for Additional Assessment S E C R <br /> ARCO Service Station 548 <br /> Stockton, California <br /> Page 5 of 6 <br /> REPORTING <br /> Upon completion of the work proposed herein , SECOR will prepare a report summarizing <br /> field activities and analytical results of the investigation. The report will be submitted to <br /> Atlantic Richfield Company and the SJCEHD and will include tabulated field , analytical , <br /> figures depicting subsurface conditions including soil and groundwater chemical analytical <br /> results; and appendices containing laboratory reports, well completion and soil boring logs, <br /> and copies of field notes and data sheets. In addition , this report will be uploaded into <br /> Geotracker. <br /> SCHEDULE <br /> SECOR and the Execution Contractor are prepared to initiate field activities upon approval <br /> of this work plan by the SJCEHD. We anticipate that field work will require approximately <br /> 12 to 16 weeks to complete, following the receipt of valid well installation permits from San <br /> Joaquin County and executed access agreements between the affected property owners <br /> and ARCO. <br /> i <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in SECOR's <br /> contract and with generally accepted professional engineering and environmental <br /> consulting practices existing at the time this report was prepared and applicable to the <br /> location of the site . It was prepared for the exclusive use of Atlantic Richfield Company, a <br /> BP Affiliated Company, for the express purpose stated above. Any re-use of this report for <br /> a different purpose or by others not identified above shall be at the user's sole risk without <br /> liability to SECOR. To the extent that this report is based on information provided to <br /> SECOR by third parties, SECOR may have made efforts to verify this third party <br /> information , but SECOR cannot guarantee the completeness or accuracy of this <br /> information . The opinions expressed and data collected are based on the conditions of the <br /> site existing at the time of the field investigation . No other warranties, expressed or implied <br /> are made by SECOR. <br /> Prepared by: <br /> A ENI <br /> Kristin Shelton <br /> Associate Engineer <br /> All information , conclusions, and recommendations provided by SECOR in this document <br /> regarding the site has been prepared under the supervision of and reviewed by the <br /> Licensed professional whose signature appears below. <br /> eRE EE lOyq <br /> Licensed Approver: Q�p � <br /> ti <br /> c <br /> C58 9 �� m <br /> 2i7kosky <br /> zusty , E. * EXP. 12/31/2068 <br /> Principal Engineer <br /> sr CIVIL <br /> April 25, 2007 �rFOFOALvF <br />
The URL can be used to link to this page
Your browser does not support the video tag.